Laserfiche WebLink
Monitoring Well Parameter Log <br /> Project Name: Geweke Car Capitol Project No.: 4001-001 <br /> Project Location: 16 S. Cherokee Ln., Lodi CA Date: June 30- 1993 <br />' Monitoring Well No.: MW-7 Depth To Water: 58.44' <br /> Well Depth: 68.50' - (DTW) 58.44'x 0.16 = Well Volume: 1.6 oal. <br /> Amount Purged: 4 pal. Sample Time: 1432 <br /> Time Temperature Conductivity pH <br /> x 100 mhos <br /> 1420 82.4 3.45 8.07 <br /> 1422 75.4 3.56 8.00 <br /> 1425 73.7 3.66 7.89 <br /> 1427 72.6 3.61 7.86 <br />' 1429 72.4 3.59 7.80 <br /> 1 <br />