I. <br /> I2.2 Additional Assessment <br /> GeoAudit submitted a work plan for the installation of additional soil borings and wells in <br /> April 1993. The objective of this phase of investigation was to complete the assessment of <br /> the lateral and vertical extent of vadose zone contamination, and to install remedial wells. <br /> I One monitoring well, four remediation wells and two additional soil borings were installed <br /> during this phase of the investigation. The results of the final investigation at the site were <br /> included in the amended FRP submitted by GeoAudit in July of 1993. The locations of all <br /> Iwells are illustrated in Figures 2 and 3. <br /> In accordance with the FRP, three additional remediation wells were also installed by <br /> IGeoAudit in October of 1993. The results of the third quarter monitoring and the data <br /> obtained from the installation of remedial wells VW-5, VW-6, and VW-7, were presented <br /> in the September 1993 Quarterly Report. <br /> 2.3 Quarterly Monitoring <br /> Between May of 1990 and June of 1993, several consulting firms, including Sun Tech <br /> Environmental, Inc., performed quarterly groundwater monitoring at the site. GeoAudit was <br /> retained in July of 1993 to continue quarterly monitoring at the site in accordance with the <br /> C & A order. <br /> The last quarterly monitoring was performed on December 27, 1993. Monitoring wells MW- <br /> 6, MW-7,MW-10, MW-11, MW-12,MW-13, MW-14 and EW-1 were sampled in accordance <br /> with C & A order. <br /> IPetroleum hydrocarbons were detected in samples from MW-7, MW-10, MW-11, MW-14 <br /> and EW-1. The concentrations of petroleum hydrocarbons decreased in MW-14 and EW-1 <br /> Ifrom the September 1993 sampling; however, concentrations in MW-7, MW-10 and MW-11 <br /> increased. <br /> IVolatile halogenated hydrocarbons(HVOC's,EPA 601),specifically 1,2-DCA,were detected <br /> in EW-1, MW-13 and MW-14 during the December 1993 sampling. In each well, the <br /> concentration of 1,2-DCA increased from the September monitoring. Result of the <br /> IDecember monitoring were reported in the Quarterly Report for December 1993 by <br /> GeoAudit. <br /> I2.4 Blower Installation <br /> I In December 1993, a low-pressure blower was installed at the site. The blower was installed <br /> to provide a low pressure air source to the remediation wells in preparation for inoculation <br /> of the hydrocarbon-consuming bacteria. The blower provides air to remediation wells VW-1 <br /> through VW-7 and monitoring wells MW-3, MW-4, MW-5 and MW-14. Initially, the blower <br /> was providing air to all the piped wells. However, at the outset of the pilot test (see below), <br /> 13-1-AW Audi)� Savior,Inc 3 <br /> I.33* LZM QIP <br />