Laserfiche WebLink
4'v <br /> . 20 October 1997 <br /> AGE-NC Project No. 95-0109 <br /> Page 5 of 5 <br /> • AGE is in the process of obtaining a waste discharge permit or waiver for nutrient addition <br /> at the site. Nutrient addition should commence upon receipt of the discharge permit or <br /> approval of the waiver. <br /> • Soil monitoring should be performed during the forth quarter of 1997. Sampling should be <br /> performed in conjunction with nutrient addition, if possible. <br /> • The next quarterly ground water monitoring at the site should be scheduled for December <br /> 1997. Wells should be sampled in accordance with the Revised Monitoring and Reporting <br /> Program. <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities. The findings were based upon field <br /> measurements and analytical results provided by an independent laboratory. Evaluations of the <br /> geologic/hydrogeologic conditions at the site for the purpose of this investigation are made from a <br /> limited number of available data points (i.e. ground water samples) and subsurface conditions may <br /> vary away from these data points. No other warranty, expressed or implied, is made as to the <br /> professional recommendations contained in this report. <br /> Advanced GeoEnvironmcntal,Inc. <br />