My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3003
>
2800 - Aboveground Petroleum Storage Program
>
PR0528317
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:47:46 AM
Creation date
5/17/2019 3:59:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528317
PE
2832
FACILITY_ID
FA0004400
FACILITY_NAME
STOCKTON STEEL CO
STREET_NUMBER
3003
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618002
CURRENT_STATUS
01
SITE_LOCATION
3003 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ruvalcaba, Cesar <br /> From: Ron Fleming <ron@secainccom> <br /> Sent: Thursday, June 13,2019 2:55 PM <br /> To: Ruvalcaba,Cesar <br /> Cc: Swem,Jay <br /> Subject: Stockton Steel- Return to Compliance <br /> Attachments: SS Return to Compliance- Signed.pdf, SS Return to Compliance - Details.pdf, SS SPCC <br /> Plan (6-11-19) DRAFT.pdf, SS Double Walled Tank Determination.pdf <br /> Cesar, <br /> Please find attached the Return to Compliance statement signed by Jay Swem. Mr. Swem has asked me to send this e- <br /> mail and attached documents on his behalf. <br /> Stockton Steel worked diligently over the past four weeks to understand and address all findings. Stockton Steel studied <br /> your report,STI's SP001 and the EPA's SPCC Guidance for Regional Inspectors and compared these to the facility. <br /> Stockton Steel took this opportunity to involve several Stockton Steel employees in the development and <br /> implementation of corrective actions. Inspection checklists were improved and added to the SPCC plan.The checklists <br /> include all inspection requirements found in STI-SP001 while being formatted in a manner that makes the checklists <br /> site-specific.Those who will be performing the inspections were trained on each line item in the inspection. <br /> The attached SPCC Plan has all modified sections highlighted.The plan has been reviewed and approved by a P.E. and <br /> will soon be stamped. Once we secure the stamped cover page we will send you the official,stamped copy.This should <br /> be within the next 1-2 days. <br /> Stockton Steel appreciates your professionalism and support in this matter. <br /> Ron Fleming <br /> JAN Environmental for Stockton Steel <br /> (602)619-5040 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.