Laserfiche WebLink
SS SPCC Ran(811-19)DRAFT <br /> Page 15 <br /> Prod ctable Spi 11 and Plarned Response <br /> Doleof Volu ne Rate Direction Prevention Method andlor Planned Spill <br /> Coriairw lD i Chert. Maafeave Type,of Failure pawns nr. ffl. Response <br /> PE414 157 Hydraulic dl 2012 Reservoir or 30 10 NA Prevention-Spill is confined to building. <br /> BML 42 Saw hose fail urea (Cor/sad by Reg-Abel y granul or absorbent. <br /> Transfers overtill, bring) Collect in 55 gall on steel drums. <br /> Electric Trensfamnare(Cil Reservcirs) <br /> Trans001 -350 Dielectric fluid -2000 Tank wall fail ure 350 5 Scum Reg-As y granul or absorbent <br /> boars to block Flow.Call electric company <br /> and/or spill response contractor. <br /> Troll -120 Dielectric fluid -2000 Tank wall fail ure 120 5 Nath Reg-Appl y granul or absorbent <br /> boars to block flaw.Call electric carpany <br /> and/or Will response contractor. <br />