Laserfiche WebLink
Hazardous Waste Contingency Plan - Page 5 of 6 <br />I. Training: <br />Check all boxes which apply. [Note: Items marked with an asterisk (*) are required.]: <br />1. Personnel are trained in the following procedures: <br />® <br />Internal alarm/notification * <br />® <br />Evacuation/re-entry procedures & assembly point locations* <br />❑ <br />Emergency incident reporting <br />® <br />External emergency response organization notification <br />® <br />Locations and contents of Emergency Response/Contingency Plan <br />❑ <br />Facility evacuation drills which are conducted at least s eci (e.g. "Quarterly", etc. <br />2. Chemical Handlers are additionally trained in the following: <br />® <br />Safe methods for handling and storage of hazardous materials <br />® <br />Locations and proper use of fire ands ill control equipment <br />® <br />Spillprocedures/emergency procedures <br />® <br />Proper use of personal protective equipment <br />® <br />Specific hazard(s) of each chemical to which they may be exposed, including routes of exposure (i.e. inhalation, ingestion, <br />absorption) * <br />® <br />Hazardous Waste Handlers/Managers are trained in all aspects of hazardous waste management specific to theirjob duties (e.g. <br />container- accumulation time requirements, labeling requirements, storage area inspection requirements, manifesting <br />requirements, etc.) * <br />3. Emergency Response Team Members are capable of and engaged in the following: <br />❑ <br />Personnel rescue procedures <br />❑ <br />Shutdown of operations <br />❑ <br />Liaison with responding agencies <br />❑ <br />Use maintenance and replacement of emergency response equipment <br />❑ <br />Refresher training, which is provided at least annual) * <br />❑ <br />Emergency response drills which are conducted at least (specify) (e.g. "Quarterly", etc. <br />J. Recordkeeping: <br />1. Check all boxes which apply. The following records are maintained at the facility. [Note: Items marked with an asterisk (*) are <br />required.]: <br />® <br />Current employees' training records to be retained until closure of thefacility) * <br />® <br />Former employees' training records to be retained at least three years after termination of employment) <br />® <br />Training Program(s)() (i.e. written description of introductory and continuing training) <br />® <br />Current copy of this Emergency Response/Contingency Plan * <br />® <br />Record of recordable/reportable hazardous material/waste releases <br />® <br />Record of hazardous material/waste storage area inspections <br />® <br />Record of hazardous waste tank daily inspections * <br />❑ <br />Description and documentation of facility emergency response drills <br />Note: i ne aoove list of recoras aoes not necessaruy iaenr Jy every rype qj recora requrrea to oe murmurneu oy ine,tucnny. <br />K. Amendment of Contingency Plan: <br />This plan must be reviewed, and immediately amended, if necessary, whenever: <br />a. Applicable regulations are revised <br />b. The plan fails in an emergency <br />c. The facility changes its design, construction, operation, maintenance, or other circumstances in a way that materially increases <br />the potential for fires, explosions, or releases of hazardous waste or hazardous waste constituents, or changes the response <br />necessary in an emergency. <br />d. The list of emergency coordinators changes. <br />e. The list of emergency equipment changes. <br />UN -017 - 5/6 www.unidocs.org Rev. 03/27/08 <br />