My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:20:04 PM
Creation date
5/20/2019 9:20:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARCO Products Comparle <br /> 2000 Alameda de las Pulgas , 'd' 9`A r"' <br /> Mailing Address:Box 5811 44 ��' t " <br /> San Mateo,California 902 <br /> Telephone 415 5712400 NOV 15 1990 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> November 9, 1990 <br /> Ms. Margaret Lagorio <br /> San Joaquin County <br /> Public Health Services <br /> Environmental Health Division <br /> 1601 East Hazelton Avenue <br /> Stockton, California 95201 <br /> Re: ARCO Service Station No. 6100 <br /> 25775 Patterson Pass Road, Tracy, California <br /> I declare, to the best of my knowledge at the present time, that the information and/or <br /> recommendations contained in the attached proposal or report are true and correct, and that <br /> all work and reports which required geologic or engineering evaluations and judgments have <br /> been performed under the direction of an appropriately registered or certified professional. <br /> The attached proposal or report utilizes the "Regional Board Staff Recommendations for <br /> Initial Evaluation and Investigation of Underground Tanks" and "Appendix An reporting <br /> format. The LUFT Manual has also been utilized as a guidance document. <br /> Furthermore, ARCO agrees to submit, in the month and year noted, a "Soil Contamination <br /> Work Plan', a "Preliminary Report" and a "Soil Remediation Plan" in order that new <br /> installation of underground storage tanks may proceed. <br /> i) "Soil Contamination Work Plan" by February 1. 1991 to the San Joaquin County <br /> PHS/EHD. <br /> ii) "Preliminary Report"and "Soil Remediation Plan"by May 1. 1991 to the San Joaquin <br /> County PHS/EHD and the Central Valley Regional Water Quality Control Board. <br /> Submitted by: <br /> i <br /> Kyle A. Christie <br /> Environmental Engineer <br /> APPC-7025-D <br /> ARCO Products Company Is s Division of ARanDLRlcldbldCumpany (9-88) <br />
The URL can be used to link to this page
Your browser does not support the video tag.