Laserfiche WebLink
ARCO Service Station #6100 September 12, 2012 <br /> 25775 Patterson Pass Page 2 of 2 <br /> COMMENTS AND CONDITIONS: <br /> 1. An EHD permit will be required for the well installations. Please submit to EHD a <br /> permit application, a MFR, and appropriate fees. <br /> 2. All necessary agency permits to construct and operate the SVE/AS remediation <br /> system must be obtained as required. <br /> 3. The final installation report and the first remediation report must be submitted to the <br /> EHD by January 30, 2012, and uploaded to GeoTracker(SWBCB website). <br /> DATED �J!/oa0/� BYf-4 <br /> Harlin Knoll, Senior REHS (209) 468-3442 <br /> Cc: Arcadis U.S., Inc., 950 Glenn Drive, Suite 125, Folsom, CA 95630 <br />