Laserfiche WebLink
• TABLES • <br /> OPERATIONAL UPTIME AND FLOW RATE <br /> FOR SOIL VAPOR EXTRACTION SYSTEM-UNIT 1 (SL.NO.: 9321) <br /> ARCO Facility No. 6100 <br /> 25775 South Patterson Pass Road <br /> Tracy, California <br /> Date Hr.Meter Flow Rate Vacuum Influent Days Between Sampling Cumulative Das I Percent <br /> Reading (scfm) ("WC PID my Total Das Uptime Total Das Uptime Uptime <br /> 03/09/04 NM 193.07 10 330 System start-up, collect samples and shutdown awaiting <br /> analytical results <br /> 03/15/04 NM 199.73 10 180 Sy stem start-up upon S approval <br /> 03/23/04 NM 196.40 12 230 8 6 <br /> 03/29/04 NM 40 10 262 6 12 <br /> 04/05/04 NM 1 142.041 10 783 7 19 <br /> 04/12/04 NM 66.57 10 707 7 26 <br /> 04/19/04 0 306.25 1 12 NM 7 33 <br /> 04/19/04 Install hour meter <br /> 04/26/04 170 99.861 10 362 7 7 40 402 100% <br /> 05/03/04 337 177.591 10 380 7 7 47 47 100% <br /> 5/10/20043 504 NM NM NM 7 7 54 54 100% <br /> 05/17/04 509.5 NM NM NM 7 0 61 54 100% <br /> 05/17/04 System re-started after replacing solid state relay <br /> 05/24/04 674 79.891 12 159 7 7 68 61 100% <br /> 05/28/04 773.2 93.201 12 123 4 4 72 65 100% <br /> 06/07/04 1,009 83.221 14 168 10 10 82 75 100% <br /> 06/29/04 1,537 66.571 17 141 22 22 104 97 100% <br /> 07/12/04 1,848 83.221 11 212 13 13 117 110 100% <br /> 07/26/04 2,185.7 166.441 12 558 14 14 131 124 100% <br /> 08/02/04 2,356.7 149.791 10 NM 7 7 138 131 100% <br /> 08/16/04 2,691.0 146.471 10 420 14 14 152 145 100% <br /> 08/23/04 2,862.1 169.771 10 210 7 7 159 152 100% <br /> 08/30/04 3,027.4 149.79 1 10 398 7 7 166 159 100% <br /> 09/08/04 3,246.2 176.421 10 320 9 9 175 168 100% <br /> 9/30/2004" 3,566.8 NM NM NM 22 13 197 182 61% <br /> "WC-Inches water column <br /> scfin-Standard cubic feet per minute measured using guages calibrated to standard pressure and temperature. <br /> NM-Not measured <br /> 'Includes dilution air flow rate <br /> Due to lack of hour-meter data prior to this and based on field notes,this value is estimated. <br /> System shutdown to replace solid state relay <br /> System shutdown due to heating element malfunction. System to be re-started after replacing heating element <br /> ARCO 6100 0&M Page 1 of 1 STRATUS <br />