Laserfiche WebLink
00 S E C O R <br /> Work Plan for Soil and Groundwater I, "tigation <br /> Former ARCO Service Station#0760 <br /> December 13,2006 <br /> Page 7 <br /> LIMITATIONS <br /> This work plan presents our understanding of existing conditions at the subject site. The <br /> conclusions contained herein are based on the analytical results and professional judgment in <br /> accordance with current standards of professional practice; no other warranty is expressed or <br /> implied. SECOR assumes no responsibility for data reported by other consultants or contractors. <br /> Should you have any questions or comments regarding this work plan, please feel free to contact <br /> the undersigned at (916) 861-0400 ext.229. <br /> Sincerely, <br /> SECOR International, Incorporated <br /> Prepared By: <br /> 4k�k sutt:7 <br /> Kristin Shelton <br /> Associate Engineer OFESS/ <br /> Reviewed By: �F,��y E.BEI���q�F� <br /> ? 5' _-/ ti► <br /> 4Rusty <br /> ;, Jw Q7 JC 58399 ,c mofIiEXP. 17/31%2008 <br /> Benkosky, E. <br /> Principal Engine6r sT9r clo- <br /> EOFCAO1 <br /> Attachments: Figure 1 Site Location Map <br /> Figure 2 Site Plan with Proposed Well and Vapor Probe Locations <br /> Figure 3 Typical Soil Vapor Probe Detail <br /> Figure 4 Soil Vapor Sampling Schematic <br /> Table 1 Historical Groundwater Monitoring and Analytical Data <br /> Table 2 Well Construction Details <br /> Table 3 Groundwater Gradient Table <br /> Attachment A RWQCB Letter Dated October 31, 2006 <br /> Attachment B Field and Laboratory Procedures <br /> cc: Mr. Don Pratt, Atlantic Richfield Company (uploaded to ENFOS) <br /> Ms. Margaret Lagorio, San Joaquin County Environmental Health Department <br /> Uploaded to Geotracker <br /> ARCO 00760 Soil and Groundwater Investigation W P.doc <br />