My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 1:52:10 PM
Creation date
5/20/2019 1:44:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
00 S E C O R <br /> Work Plan for Soil and Groundwater I, "tigation <br /> Former ARCO Service Station#0760 <br /> December 13,2006 <br /> Page 7 <br /> LIMITATIONS <br /> This work plan presents our understanding of existing conditions at the subject site. The <br /> conclusions contained herein are based on the analytical results and professional judgment in <br /> accordance with current standards of professional practice; no other warranty is expressed or <br /> implied. SECOR assumes no responsibility for data reported by other consultants or contractors. <br /> Should you have any questions or comments regarding this work plan, please feel free to contact <br /> the undersigned at (916) 861-0400 ext.229. <br /> Sincerely, <br /> SECOR International, Incorporated <br /> Prepared By: <br /> 4k�k sutt:7 <br /> Kristin Shelton <br /> Associate Engineer OFESS/ <br /> Reviewed By: �F,��y E.BEI���q�F� <br /> ? 5' _-/ ti► <br /> 4Rusty <br /> ;, Jw Q7 JC 58399 ,c mofIiEXP. 17/31%2008 <br /> Benkosky, E. <br /> Principal Engine6r sT9r clo- <br /> EOFCAO1 <br /> Attachments: Figure 1 Site Location Map <br /> Figure 2 Site Plan with Proposed Well and Vapor Probe Locations <br /> Figure 3 Typical Soil Vapor Probe Detail <br /> Figure 4 Soil Vapor Sampling Schematic <br /> Table 1 Historical Groundwater Monitoring and Analytical Data <br /> Table 2 Well Construction Details <br /> Table 3 Groundwater Gradient Table <br /> Attachment A RWQCB Letter Dated October 31, 2006 <br /> Attachment B Field and Laboratory Procedures <br /> cc: Mr. Don Pratt, Atlantic Richfield Company (uploaded to ENFOS) <br /> Ms. Margaret Lagorio, San Joaquin County Environmental Health Department <br /> Uploaded to Geotracker <br /> ARCO 00760 Soil and Groundwater Investigation W P.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.