My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012750
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0012750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:54:46 PM
Creation date
5/20/2019 1:51:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012750
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aa a <br /> �" 441 00111 .7a. �- - <br /> Site Safety Plan December 17, 1990 <br /> ARCO Station No. 760, Lodi, California AGS 38048-5S <br /> w <br /> The Staff Geologist or Engineer will also act as the Site Safety Officer. As such,the Staff <br /> Geologist or Engineer is responsible for addressing the following items: <br /> o Implementing the Site Safety Plan, Company policy, and procedures <br /> o Requiring and maintaining adequate safety sur.plies and equipment inventory <br /> onsite <br /> o Conducting daily safety meetings and advising workers regarding hazards <br /> o Site control, decontamination, and contamination-reduction procedures <br /> o Reporting accidents or incidents <br /> The Staff Geologist or Engineer has the authority to suspend work any time he or she finds <br /> that the provisions of the Plan are inadequate for worker safety. The Staff Geologist or <br /> Engineer will inform the Project Manager and the Health and Safety Coordinator promptly <br /> of deficiencies within the Plan or individuals or subcontractors whose conduct is nr)t <br /> consistent with the requirements of this Pian. <br /> — MEDICAL SURVEILLANCE <br /> Applied GeoSystems personnel and subcontractors engaged in project activities must <br /> participate in a medical surveillance program end must be cleared by the examining <br /> physician(s)to wear respiratory protection devices and protective clothing for working with <br /> hazardous materials. The applicable requirements of Title 8,Section 5216,of the California <br /> Administrative Code will be observed. The applicable requirements under 29 CFR <br /> 1910.120 of the Federal Administrative Code will also be observed. <br /> SAFETY AND ORIENTATION MEETING <br /> Field personnel from Applied GeoSystems and its subcontractors will attend a project- <br /> specific training meeting for safety issues and review the project tasks before beginning <br /> ' work. The meeting will be led by the Project Manager or,Staff Geologist or Engineer. In <br /> addition, fit-testing of respiratory protective devices will be conducted as part of the safety <br /> orientation meeting when the use of a respirator may be required. <br /> _ 2 <br /> LAoolleo, GeoSvsterns <br />
The URL can be used to link to this page
Your browser does not support the video tag.