Laserfiche WebLink
A. <br />�r^ <br /> r � <br /> Site Safety Plan September 15, 1989 <br /> �. ARCO Station No. 760, Lodi California AGS 38048-2S <br /> w <br /> The Staff Geologist or Engineer will also act as the Site Safety Officer. As such, the Staff <br /> Geologist or Engineer is responsible for addressing the following items: <br /> +..� o Implementing the Site Safety PIan, Company policy, and procedures <br /> o Requiring and maintaining adequate safety supplies and equipment inventory <br /> onsite <br /> o Conducting daily safety meetings and advising workers regarding hazards <br /> r+ <br /> o Site control, decontamination, -,,:.d Contamination-reduction procedures <br /> o Reporting accidents or incidents <br /> The Staff Geologist or Engineer has the authority to suspend work any time he or she finds <br /> that the provisions of the Plan are inadequate for worker safety. The Staff Geologist or <br /> Engineer will inform the Project Manager and the Health and Safety Coordinator promptly <br /> of deficiencies within the PIan or individuals or subcontractors whose conduct is not <br /> consistent with the requirements of this Plan. <br /> MEDICAL SURVEILLANCE <br /> Applied GeoSystems personnel and subcontractors engaged in project activities must <br /> participate in a rnedical surveillance program and must be cleared by the examining <br /> physician(s) to wear respiratory protection devices and protective clothing for working with <br /> hazardous materWs. The applicable requirements of Title 8,Section 5216,of thear -nia <br /> Administrative Code will be observed. The applicable requirements under 29 CFR <br /> 1910.120 of the Federal Administrative,Code will also be observed. <br /> SAFETY AND ORIENTATION MEETING <br /> Field personnel from Applied GeoSystems and its subcontractors will attend a project- <br /> specific training meeting for safety issues and review the project tasks before beginning <br /> t work. The meeting will be led by the Project Manager or Staff Geologist or Engineer. In <br /> addition, fit-testing of respiratory protective devices will be conducted as part o:the safety <br /> orientation meeting when the use of a respirator may be required. <br /> 2 <br /> App-led Gem ystems <br />