Laserfiche WebLink
k <br /> Work Plan, Excavation and Soil Sampling April 24, 1989 <br /> ARCO Service Station No. 760, Lodi, California 38048-2W <br /> on station operations. Copies of laboratory analysis reports and <br /> Chain of Custody Records will be included in our report. <br /> REPORT PREPARATION <br /> A report summarizing field methods, laboratory procedures, <br /> laboratory results, and recommendations for future actions will <br /> be supplied to ARCO. All gathered information will be considered <br /> confidential and released only with the authorization of ARCO. <br /> PROSECT STAFF <br /> Ms. Gillian S Holmes, a Registered Geotechnical Engineer (G.E. <br /> 2823) and Registered Civil Engineer (C.E. 34812) in California, <br /> �e will be in charge of this project. Ms. Eloise K. Frick, Project <br /> Geologist, will manage field and office operations. Applied <br /> GeoSystems employs a staff of geologists and technicians who will <br /> gar help complete the project. <br /> s <br /> ;..., 9 <br /> W APP1le1,� GeoSystems <br />