My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012750
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0012750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:54:46 PM
Creation date
5/20/2019 1:51:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012750
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br /> a� <br /> r <br /> f's <br /> June 25, 1991 <br /> ARCO Service Station 760, Lodi, California <br /> i Initial estimates of the effective radius of influence of 22 feet from each vaporextraction <br /> well were`mada wing a vacuum of 30 inches of water column, a flaw rate r..f 50 cmf, an <br /> initial TPTg concentration of 10,000 mg/m3, and the duration of operation of-a vapor <br /> extraction aratem of 12 months. This estimate of the radius of influence can be further <br /> refined as the subsurface environmental investigation progresses. The location and screened : <br /> interval of subsequent vaporextraction wells will be based on this refined data. <br /> Conclusions <br /> Low levels of residual hydrocarbons were detected in the proposed tank cavity. Results of <br /> f vapor extraction at this site is a practical and <br /> the vaporextraction test indicate the use o <br /> efficient choice as a soil remediation alternative. <br /> At the request of ARCO, we will observe <br /> the installation of six conductor casings in the <br /> locations shown on Plate 2 before the tanks are installed. These conductor casings will <br /> allow soil borings to be drilled between the new tanks at a later dale to delineate the <br /> residual hydrocarbons. After the residual hydrocarbons are delineated vertically and <br /> laterally, vaporextraction wells can be installed between the proposed tanks to <br /> remediate the soil if warranted. <br /> .ARCO'li.requesting,authorization to install the new tanks in the proposed tank 81)ity as <br /> planned No;remediation will be conducted until we submit a Remedial flan to your agency i <br /> and:the plan is ciriated`for a 30-day public review. ; <br /> N..'. <br /> 0624ctm 4 <br /> r' <br />
The URL can be used to link to this page
Your browser does not support the video tag.