My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001799
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001799
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:33:03 PM
Creation date
5/20/2019 2:04:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001799
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inon SM02 Associates <br /> ' 1433 North Market Boulevard •Sacramento California 95834-1943 + (916)928-3300• Fox(916)928-3341 <br /> D <br /> ~ September 14, 1994 <br /> 1 <br /> ' Ms Diane M Hinson <br /> San Joaquin County Public Health Services <br /> ' Environmental Health Division <br /> 445 North San Joaquin Street <br /> P O Box 388 <br /> ' Stockton, CA 95201 <br /> Subject ARCO Service Station No 760, located at 225 South Cherokee Lane, Lodi <br /> ' and ARCO Service Station No 548, located at 1612 Hammer Lane, <br /> Stockton, California <br /> ' Ms Hinson <br /> At the request of ARCO Products Company (ARCO), EMCON Associates (EMCON) has <br /> evaluated information/data gathered during site investigations conducted at ARCO service <br /> station No 760 (Lodi site) and No 548 (Stockton site) in an effort to prioritize which site <br /> warrants the next available San Joaquin County designated ARCO vapor extraction <br />' treatment unit The evaluation was requested by San Joaquin County Public Health <br /> Services, Environmental Health Division (PHS/EHD) in the meeting held on August 9, <br />' 1994 at the office of PHS/EHD, and confirmed in PHS/EHD's letter dated August 29, <br /> 1994, stating further evaluation is necessary at each site to determine the site's <br /> prioritization to obtain the vapor extraction treatment unit The vapor extraction treatment <br />' unit has been purchased by ARCO and has been designated for remediation at ARCO <br /> sites located in San Joaquin County The treatment unit is currently being assembled and <br /> should be ready for delivery in the fourth quarter of 1994 <br />' The evaluation included calculating the total estimated hydrocarbon mass in soil, <br /> reviewing groundwater gradient and flow directions, estimating the permeability of <br />' subsurface materials containing hydrocarbons, and identifying water supply wells in the <br /> area Data used for the evaluation of the two ARCO sites consisted of boring logs, soil <br /> and groundwater laboratory results, cross sections, isoconcentration and flow direction <br />' maps, and a well survey This information was gathered from reports generated for <br /> ARCO, which have been previously submitted to PHS/EHD The results of the evaluation <br /> are presented below <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.