My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001805
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001805
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:23:27 PM
Creation date
5/20/2019 2:07:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001805
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Date March 10,2006 <br /> Quarter I"Quarter 2006 <br /> . APPENDIX A <br /> FIELD AND LABORATORY PROCEDURES <br /> Sampling Procedures <br /> Sampling equipment is thoroughly cleaned prior to the collection of each sample The sampling procedure for each <br /> well includes measuring the water level and checking for the presence of separate-phase hydrocarbons(SPH), using <br /> either an electronic indicator and a clear Teflon® bailer or an oil-water Interface probe Wells not containing SPH <br /> are purged of approximately three casing volumes of water (or to dryness) using a submersible pump, centrifugal <br /> pump, gas displacement pump, or bailer The equipment and purging methods used for the current sampling event <br /> are noted on the attached field data sheets During purging, temperature, pH, electrical conductivity, and dissolved <br /> oxygen are monitored in order to document that these parameters are stable prior to collecting samples After <br /> purging, water levels are allowed to partially recover Groundwater samples are collected using a clean disposable <br /> Teflon®bailer,placed into appropriate EPA-approved containers,labeled, logged onto chain-of-custody documents, <br /> and transported on ice to a California state-certified laboratory <br /> Decontamination Procedures <br /> Prior to sampling each well,reels and pumps will be decontaminated with a steam cleaner Sensitive equipment such <br /> as the water Ievel sounder are sprayed with a non-phosphate soap and detonized water solution and rinsed with <br /> detonized water All water used for equipment decontamination is collected and contained in a truck-mounted water <br /> tank <br /> Laboratory Procedures <br /> The groundwater samples are analyzed for the presence of GRO (gasoline range organics C4 — C12), benzene, <br /> toluene, ethylbenzene, and xylenes (total), fuel oxygenates, 1,2-DCA, and EDB by using EPA Method 8260B The <br /> methods of analysis for the groundwater samples are documented in the laboratory analytical report The certified <br /> laboratory analytical report,chain-of-custody documentation,and field data sheets are presented as Appendix B <br /> Purge and Rinsate Water Disposal <br /> Water generated during well sampling and equipment cleaning is pumped into a truck-mounted water tank The <br /> water is transported to Blaine Tech's holding facility in Roseville, California, for temporary storage Dillard <br /> Environmental Services transports the water to the Altamont Landfill and Resource Recovery Facility in Altamont, <br /> California for disposal <br /> K NWprocessVS BY ARMOM601QuanerlyQ00611 QTR 061760 GWMR IQ06 0o Page A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.