My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001805
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001805
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:23:27 PM
Creation date
5/20/2019 2:07:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001805
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�It (11 <br /> Date March 10,2006 <br /> Quarter 1"Quarter 2006 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 760 <br /> Address 225 South Cherokee Lane, Lodi, CA <br /> ARCO Environmental Engineer Paul Su le <br /> Consulting Co/Contact Person URS/Vernon Elarth <br /> Consultant Project No 38466403 0A143 <br /> Primary Agency/Regulatory ID No San Joaquin County Environmental Health Department <br /> Assembly Bill 681 Status Property Owned by Gurpreet Dhatt and Kuldeep Dhatt <br /> WORK PERFORMED THIS QUARTER (First 2006): <br /> 1 Performed quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted quarterly groundwater monitoring report <br /> 3 Submitted site closure report <br /> WORK PROPOSED FOR NEXT QUARTER (Second 2006): <br /> 1 Perform quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit quarterly groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY (First 2006): <br /> Current Phase of Project Monitoring/Assessment <br /> Frequency of Groundwater Sampling MW-1 through MW-5 sampled quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product (FP) Present Onsite No <br /> FP Recovered this Quarter None <br /> Cumulative FP Recovered to Date None <br /> Current Remediation Techniques None <br /> Approximate Depth to Groundwater 58 58 to 60 45 feet below ground surface (bgs) <br /> Groundwater Flow and Gradient Southwest @ 0 02 feet/foot ft/ft <br /> ANALYTICAL DATA REVIEW: <br /> Based on the review of the analytical and hardcopy data (chain-of-custody records, blanks, dilutions, holding times, <br /> LCS/LCSD results, MS/MSD results, and surrogate recoveries), the data are acceptable as reported by the <br /> laboratory <br /> DISCUSSION: <br /> Gasoline range organics (GRO), benzene, toluene, ethylbenzene, total xylenes, methyl tert-butyl ether (MtBE), and <br /> 1,2-dichloroethane (1,2-DCA) were detected above laboratory reporting limits in groundwater samples collected <br /> from site monitoring wells this quarter In MW-1, GRO, total xylenes, MtBE, and 1,2-DCA concentrations <br /> decreased GRO, BTEX, MtBE, and 1,2-DCA concentrations in MW-2 increased In MW-3, GRO, total xylene, <br /> and 1,2-DCA concentrations increased Other analyte concentrations were generally consistent with the historic data <br /> r. <br /> K 1WproeessV5 BP ARM0W601Quartealy00061i QTR 061760 GWMR tQ06 do Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.