My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001809
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
225
>
2900 - Site Mitigation Program
>
PR0508009
>
ARCHIVED REPORTS XR0001809
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:30:01 PM
Creation date
5/20/2019 2:09:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001809
RECORD_ID
PR0508009
PE
2957
FACILITY_ID
FA0007882
FACILITY_NAME
ARCO #760
STREET_NUMBER
225
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04314058
CURRENT_STATUS
01
SITE_LOCATION
225 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ENVIRONMENTAL HEALTH DEPARTMENT <br /> Pqu+N <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Donna K Heran,R E H 5 304 East Weber Avenue, nird Floor Carl Borgman,R E H S <br /> £ Director Mike Huggins,R E H S,R D I <br /> •4 r Al Olsen,R E H S Stockton, California 95202-2708 Douglas W Wilson,R E H S <br /> � P Program Manager Telephone (209) 468-3420 Margaret Lagono,R E H S <br /> Lf F°it Laurie A Cotulla,R E H S <br /> Program Manager FaX (209) 464-0138 Robert McClellon,R E H S <br /> Mark Barcellos,R E H S <br /> PAUL SUPPLE <br /> FEB 2 4 2004 <br /> ARCO PRODUCTS COMPANY <br /> P O BOX 6549 <br /> MOR.AGA CA 94570 <br /> RE <br /> ARCO <br />' 225 Cherokee Lane <br /> Lodi, CA <br />' San Joaquin County Environmental Health Department (EHD) has reviewed Work Plan <br /> Addendum for Soil and Groundwater Assessment(WPA) dated 28 January 2004, <br /> prepared by URS Corporation for the above referenced site The work plan addendum <br /> was prepared in response to the EHD conditional work plan approval letter dated <br /> 20 January 2004 <br /> 1 EHD approves the modification of the scope of work previously proposed in Work Plan <br /> for Soil and Groundwater Assessment dated 13 January 2004 and approved by,EHD by <br /> tetter dated 13 January 2004, as described in the WPA The scope of work now includes <br /> a first phase with installation of three soil borings with grab ground water sampling and a <br /> second phase with installation of one onsite deep ground water monitoring well, one <br /> shallow off-site ground water monitoring well and up to three additional shallow ground <br /> water monitoring wells as needed to properly monitor the plume <br /> If you have any questions contact Margaret Lagono at (209)468-3449 <br /> Donna Heran, REHS <br /> Director of Environmental Health <br /> Nuel C Henderson, Jr, RG Margaret Lagorio, REHS <br /> Site Mitigation Unit Supervisor, Site Mitigation <br /> Unit <br /> c URS—Vernon Elarth <br /> CVRWQCB--Jim Barton <br /> 1 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.