Laserfiche WebLink
BURNS �MSDONNELL.. <br /> Submittal Cover Sheet <br /> Project Title: Blue Rhino Cylinder Processing Facility-Lathrop Date: January 12,2018 <br /> Project Number: 102955 Submittal Number: UTILITY-1 <br /> Revision: 0 <br /> Submittal Title: Lift Station <br /> Subcontractor: Preston Pipelines <br /> Submittal Package: <br /> Number of Copies: Sample/Hard Copy <br /> x Electronic/PDF <br /> Subcontractor's Approval: Submission of this document shall represent Subcontractor's <br /> approval as specified in the Contract Documents. Subcontractor remains <br /> liable for the accuracy of Submittals as provided in the Contract Documents <br /> Submittal Action Stamp: <br /> A-SUBMITTAL APPROVED D-SUBMITTAL NOT APPROVED(SUBMIT ANEW) <br /> B-SUBMITTAL APPROVED AS NOTED E-FOR REFERENCE, NO APPROVAL REQUIRED <br /> C-SUBMITTAL RETURNED FOR REVISION F-DISTRIBUTION COPY(PREVIOUSLY APPROVED) <br /> COMMENTS <br /> See highlighted comments on PDF pages 13(SST discharge pipe)and pages 53-55(level probe). <br /> Date Received 1112/2018 <br /> Engineer's Action <br /> (See Contract Documents) <br /> Initials&Date Initials&Date <br /> A D <br /> B LAR 1/23/18 E <br /> C F <br />