Laserfiche WebLink
I• Minimum Requirements for Food Facility Plans <br /> Plans shall be drawn to scale. The recommended scale is '/,inch=1 foot and shall include the following: <br /> ❑ A. Name and address of the food facility;the name,mailing address and telephone number of owner,contractor and <br /> contact person. <br /> ❑ B. Vicinity Map <br /> C. Floor plan of entire facility. <br /> ❑ D. Floor plan showing equipment layout including: (see Appendix A) <br /> ❑ a)Complete equipment checklist,including the methods of installation. (see Appendix B) <br /> ❑ b)Equipment manufacturer specification sheets and/or elevations. <br /> ❑ E. Plumbing layout. <br /> ❑ F. Electrical layout. <br /> ❑ G. Exhaust hood ventilation and make-up air systems. Complete the attached worksheet for each hood. <br /> (Sec Appendix Q <br /> H. A site plan including proposed waste storage receptacle location. <br /> ❑ 1. Room finish schedule for floors,base,walls and ceiling that indicates the type of material;the color and the surface finish for <br /> each room or area. Give specific brand names. Samples or specifications of proposed finish materials may be required. (See <br /> Appendix D) <br /> II. Field Construction Inspection Procedure <br /> ❑ A. Preliminary Construction Inspection <br /> Preliminary construction inspection prior to installation of equipment is available upon request. Contact this department <br /> to request preliminary construction inspection. Our current hourly rate will be charged for this inspection. <br /> ❑ B. Final Construction Inspection <br /> Upon completion of construction,including finishing work,contact the health department to arrange for a final construction <br /> inspection. Approved materials and good workmanship are significant factors in the evaluation and final field approval of <br /> food facility construction and equipment installation. A final inspection should be requested no less than five(5)working <br /> days prior to the proposed opening of the establishment. Final construction must be approved by this agency prior to opening <br /> for business or use of remodeled areas. <br /> EHD 16-01 6 <br /> 8/4/2006 <br />