Laserfiche WebLink
tank?)---also, using STI SP001 test-criteria/format,the new tank will need to be anchored within the berm as <br /> you are located in a seismic zone. <br /> c) upon delivery, SPC Corp can conduct the integrity test......I will provide a quote but a ballpark estimate <br /> would be$750 to conduct the 5-year periodic integrity test----the reason the codes require the 2nd test is due <br /> to the prospect of any damage incurred in the shipping from Pleasant Grove, CA to Stockton,CA <br /> d) our availability to conduct the test would have to be 7/22-7/26 as we are in Los Angeles,CA all next week <br /> for inspections/testing. <br /> Cesar Ruvalcaba, San Joaquin CUPA inspector is cc'd because I debriefed him regarding our onsite inspection <br /> yesterday at your facility. The best insurance for us to get these compliance issues resolved is to keep Mr. <br /> Ruvalcaba informed as we undertake our corrective-action plan. Thanks. <br /> Paul <br /> SPC Corp <br /> 2 <br />