My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2373
>
2800 - Aboveground Petroleum Storage Program
>
PR0523161
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:41:36 AM
Creation date
5/22/2019 9:35:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523161
PE
2832
FACILITY_ID
FA0009394
FACILITY_NAME
MAXIM CRANE WORKS
STREET_NUMBER
2373
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
2373 E Mariposa Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention Compliance Corporation <br /> Tank Inspection/Evaluation and Periodic Integrity Test Certificate <br /> P.O.Box 1289........Waterford,CA 95386 Telephone: (209)969-0851 <br /> Email: soccoM(ad)hotmail.com <br /> Client Contact Person: <br /> Address Telephone#: <br /> City/State/Zip <br /> Location of Tank(s) if different from Client Address-- <br /> Tank Information (brand/product stored/gals/UL#) <br /> Description of Secondary Containment <br /> Date of Test Test Supervisor(s) <br /> METHOD OF PERIODIC INTEGRITY TEST-Primary—Secondary_ <br /> 1. Steel Thickness Test(in accordance with Chapter 7-Regional Inspector Guide of US EPA and industry <br /> standards including UL/ULC)-readings<instrumentationTM-8810 ultrasonic microprocessor>: <br /> minimum end/wall thickness(_) minimum bottom/wall thickness <br /> corrosion-choose one(significant or nominal)... <br /> pitting-choose one(significant or nominal) <br /> Coating required(explain) <br /> Detailed wall thickness readings are held in the SPC Corp client-file...total readings( <br /> 2. Nitrogen Blanket_Y N(document psi readings) Duration_ <br /> 3. CO2 Blanket_Y N (document psi readings) Duration_ <br /> 4. Tracer Gas_Y_N (document inert gas used) Duration_ <br /> Tracer Gas compatibility factors (describe) <br /> 5. Pressure-Test_Y N (document psi readings) Duration_ <br /> 6. Vacuum Test_Y N(document inches of Mercury readings_Duration_ <br /> 7. Sonar-Test_Y_N(document db readings) Duration_ <br /> 8. Camera(visual)model Lorex MC81845/interstitial YN(findings) <br /> 9. Hydro-Carbon Sensor(probe) model OMNTEC BOA-PDS _Y N (findings) <br /> 10.Hydrology (Water Column)Y N (document inches of water column <br /> readings) Duration_ <br /> TEST RESULTS <br /> 1�-Stage: <br /> Pass_Fail_(quantify) <br /> 2' -Stage: <br /> Pass Fail_(quantify) <br /> Comments section <br /> Next Scheduled Tank Inspection/Evaluation/Periodic Integrity Test <br /> If primary/secondary containment passes test, schedule next onsite appointment no later than 5 years from date <br /> of initial test <br /> Date of Next Scheduled Test <br /> (Certificate) <br /> SPC Corp Representative <br />
The URL can be used to link to this page
Your browser does not support the video tag.