My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2373
>
2800 - Aboveground Petroleum Storage Program
>
PR0523161
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:41:36 AM
Creation date
5/22/2019 9:35:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523161
PE
2832
FACILITY_ID
FA0009394
FACILITY_NAME
MAXIM CRANE WORKS
STREET_NUMBER
2373
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
Rd
City
Stockton
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
2373 E Mariposa Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�A <br /> Crene Works <br /> Mr. Cesar Ruvalcaba, Inspector-San Joaquin CUPA <br /> Subject: Upgrade to Maxim Crane-Stockton,CA operations <br /> Mr. Ruvalcaba: <br /> Please consider this submittal our request to Return to Compliance for your jurisdiction by conducting a <br /> short-term construction project to replace our existing/out-of-service 12,000 UST/AST for diesel-fuel <br /> storage. We are proposing the following installation: <br /> 1. A 10,000-gallon diesel UL2085/2245 EcoVault AST which provides: <br /> a) Doublewall/UL-listed configuration utilizing an inner UL142 primary tank <br /> b) 6-inch thermal-resistance/UL-listed 2ndary containment of reinforced concrete <br /> c) Protected-classification includes ballistic-resistance and vehicle-impact resistance <br /> d) 3-part gasket with water resistance/petrol-resistance/fire-retardant <br /> e) Dimensions: Diameter @ 9'6"x Length 27' 11"with an empty-weight of 80,000 lbs <br /> 2. Plumbing to be installed by a certified petroleum-vendor <br /> 3. NOTE: a preliminary 2-stage test was conducted on the AST confirming it is currently leak-tight <br /> 4. We have attached photos for your consideration <br /> In closing, Maxim Crane Works has retained SPC Corporation to coordinate the overall installation <br /> pending your approval. SPC Corp is conducting this activity on a no-cost basis as a goodwill gesture of <br /> insuring compliance with your guidelines for the facility. We anticipate approximately 45 days to <br /> complete construction pending your confirmation to proceed. <br /> Thank you. <br /> Cordially, <br /> Mario Bermudez <br /> Maxim Crane Works <br /> Regional Safety Manager <br /> Attachment <br />
The URL can be used to link to this page
Your browser does not support the video tag.