Laserfiche WebLink
• • <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> FACILITY BACKGROUND <br /> Various aboveground storage tanks were removed from the site. The proposed Phase II <br /> investigation is intended to evaluate whether the soil and groundwater has been impacted by <br /> previous site activities. <br /> WORK PLAN <br /> Task One: Supervise the drilling and sampling of four soil borings. <br /> Task Two: Collect soil samples at five-foot intervals for logging and possible analysis. One <br /> groundwater sample will be collected from each boring. <br /> Task Three: Submit selected soil and groundwater samples to a state certified laboratory for <br /> analysis. <br /> PAGE 4 <br />