Laserfiche WebLink
0 • <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Physical Hazards <br /> Task(s) Hazard Mitigation Measure <br /> t Heavy Equipment (Noise & Physical All heavy equipment used on this project will be in <br /> contact) good working order and operated in accordance <br /> with recognized industry standards and Cal-OSHA <br /> Title 8, Subchapter 4, Construction Safety Orders. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment will <br /> be supplied with ear protection. <br /> Dust The dust hazard will be mitigated by not allowing <br /> ground crew to be located down wind of <br /> excavation activity. In addition, water will be <br /> applied to control the dust if visible levels of dust <br /> are generated. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials. <br /> Flammable (Flash Point <100 -F) Combustible (Flash Point <200 -F) <br /> Gasoline Diesel <br /> Type and Location of Fire Extinguishers (Show on map for large projects) <br /> Dry chemical fire extinguishers Class A B and C are stored in all GZA vehicles. <br /> PAGE 6 <br />