Laserfiche WebLink
Ground Zero Analysis,Inc. <br /> SITE SAFETY PLAN <br /> On-site communications: ❑ Radio p Verbal ❑ Hand Signals <br /> ❑ Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio EI Telephone <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beginning work activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP O CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective equipment (i.e., gloves, <br /> coveralls) will be placed in 55-gallon drums with the drill cuttings. <br /> Location of Wash Water: On site <br /> Location of Toilet.• On site <br /> Location of Drinking Water: On site <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP a CHECK WHEN DONE <br /> Equipment Decontamination Procedure: Reusable sampling equipment will be washed with alconox <br /> and rinsed with water between samples. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored on-site <br /> until appropriate disposal methods are determined. <br /> PAGE 10 <br />