Laserfiche WebLink
w - <br /> .- k <br /> I <br /> 1 <br /> I j <br /> f : <br /> i . <br /> t <br /> Schedule <br /> t <br /> Murray & Associates proposes the follom ing schedule for the implementation of tasks <br /> i described he. <br /> } <br /> Date <br /> Tasks <br /> 1.1 Excavation of rerr—f*:ing contaminated soil September 24, a 990 <br /> 1.2 Obtain verification samples September 24, 1990 <br /> 1.3 Analytical results due October 15, 1990 <br /> [ 1.4 Disposal of soil complete October 31, 1990 <br /> i <br /> 2.1 Initial sampl;ng and analysis of monitoring wells September 24, 1990 f <br /> 2.2 Analytical results due October 15, 1990 <br /> 1 <br /> } 2.3 Subsequent sampling and analysis of wells December 24, 1990 i <br /> March 24, 1991 ; <br /> June 24, 1991 <br /> September 24, 1990 <br /> `. 3.1 Abandonment of 500 gallon gasoline tank September 24, 1990 <br /> 4.1 Initiate report preparation November 15, 1990 <br /> € 4.2 Subsequent Interim Reports to be prepared on January 15, 1991 <br /> April 15, 1991 <br /> Jul; 15, 1991 <br /> 4.3 Final report preparation October, 1991 <br /> 6 <br /> r; <br />