Laserfiche WebLink
--(2) STEEL DRUM (55 GAL)--------------------------------------� <br /> I <br /> ------ ---------------------------------- <br /> ----'� (-° p�EQUIPMENT BAY TO STORM WATER SSCP-3 <br /> 1' DRAINAGE DITCH I <br /> i::7 TRUCK WASH <br /> I I <br /> I I <br /> I <br /> r , FOAM STORAGE BUILDING <br /> -J <br /> L I <br /> I II <br /> ELECTRICAL I I <br /> CONTROL PANEL <br /> DEFUELING SHELTER I <br /> (1) 250 GPM r- BULK DIESEL FUEL STORAGE AREA <br /> I2) INITIAL TANKS ® 80,000 GAL. <br /> UNLOADING PUMP <br /> I I I 2 FUTURE TANKS ® 80,000 GAL. <br /> I :, I NCRETE CONTAINMENT WALL & SLAB <br /> (2) 150 GPM I _ LEGEND <br /> TRANSFER PUMPS I_cLp � O I AROUND ABOVE GROUND FUEL TANKS <br /> II <br /> _ <br /> IIIII <br /> WAD W- <br /> 53 <br /> 5 <br /> 0-XT <br /> OIL/WATER SEPARATOR <br /> ------°---- SANITARY <br /> SEW <br /> E <br /> RS <br /> LEAK DETECTION 4,000 GAL. WASTE OIL TANK <br /> GENERATOR MANHOLE SCP-2UNDERGROUND LIN <br /> E <br /> STEAM CLEANING ROOM TRAILER <br /> BAYSREPAIR <br /> COMPRESSOR ROOM TIRE SHOP STORM DRAIN <br /> MHO MANHOLE <br /> LD LEAK DETECTOR�L_Sipl <br /> -1 <br /> OIL/WATER SEPERATOR <br /> WITH DISCHARGE co CLEANOUT <br /> I I A ; MONITORING PORT <br /> SERVICE PIT 1,000 GALLON <br /> WASTE OIL TANK <br /> 61 <br /> ------------------------------ ------- OIL/WATER SEPARATOR <br /> SHOP INSPECTION / <br /> / I <br /> 112 <br /> 1,9 41,�? <br /> 2442 y i <br /> 167 NOTES: <br /> 1. SEE TABLE 1 FOR TANK CONTENTS AND CAPACITIES. <br /> 2. SEE FIGURE 3 FOR AREA DRAINAGE PLAN. <br /> 3. SEE FIGURE 4 FOR FUEL STORAGE TANKS AND TRANSFER <br /> LINES PLAN. <br /> 4. SEE FIGURE 5 FOR NON-FUEL STORAGE TANKS AND <br /> TRANSFER LINES PLAN. <br /> SITE PLAN <br /> NORTH NTS <br /> SPILL PREVENTION CONTROL YELLOW TRANSPORTATION SYSTEM, INC. TCY 2 <br /> AND COUNTERMEASURE PLAN 1535 EAST PESCADERO AV. TRACY, CALIFORNIA <br /> Fig. No. <br />