Laserfiche WebLink
TANK 2 <br /> API 653 SIMILAR SERVICE ASSESSMENT <br /> REPORT <br /> SCHEDULING NEXT OUT-OF-SERVICE OR INTERNAL <br /> INSPECTION <br /> KRK Petroleum <br /> YRC FREIGHT, TRACY, CA <br /> Report Prepared for: <br /> KIRK Petroleum <br /> Contract/Task Order Number: <br /> Report Prepared by: <br /> Powers Engineering and Inspection, Inc. (PEI) <br /> PO BOX 1928 ENGINEERING AND INSPECTION,INC. <br /> Benicia, CA 94510 <br /> Inspected on: <br /> September 24, 2010 <br /> Inspection History <br /> Tank No. Constructed Re-Erect Second External Internal UT Shell Inspection <br /> Bottom Inspection Inspection <br /> 3(Control Tank) 1991 N/A N/A 2016 2010 2016 <br /> 2(Candidate Tank) 1991 N/A N/A 2016 2016 <br /> Candidate Tank Next Inspection: 2021 2030 2021 <br /> Report Revisions: <br /> Rev.0 June 4,2019 Original Report Rev 0 <br /> inspector Re ort Professional Engineer Review <br /> Gary Powers Junn Geronimo Gary Powers API 653#691 <br />