My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
1535
>
2800 - Aboveground Petroleum Storage Program
>
PR0515797
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 9:05:19 AM
Creation date
5/28/2019 9:37:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515797
PE
2833
FACILITY_ID
FA0003854
FACILITY_NAME
YRC INC
STREET_NUMBER
1535
Direction
E
STREET_NAME
PESCADERO
STREET_TYPE
Ave
City
Tracy
Zip
95304
APN
21306026
CURRENT_STATUS
01
SITE_LOCATION
1535 E Pescadero Ave
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention Devices: The drums are not filled on site;thus,spill prevention devices are not applicable. <br /> A stick is used to determine the amount of material that can be accommodated by the portable storage <br /> containers. Overhead transfer lines pass overhead within the maintenance shop and vehicle <br /> fueling/inspection area from the underground lines from the fuel farm to the dispensing stations. There are <br /> on/off switches positioned at three locations including:the control panel at the tank fuel farm,at the vertical <br /> posts at the north end of the fuel lanes in the Inspection Area, and the north wall of the shop supervisor's <br /> office that can be utilized to shutdown overhead fuel transfer lines in the event of a leak. There are shut- <br /> off valves accessible to facility personnel for all of the non-fuel overhead transfer lines. Due to 24 hour <br /> operations, any leak would immediately be apparent to terminal personnel. <br /> Spill Flow Pattern: Spills would be contained and cleaned inside the building structure. Large spills could <br /> flow to the oil/water separator and oil recovery tank and be contained and cleaned up as outlined in Section <br /> 7.0 of this Plan. <br /> Compressor Room <br /> Secondary Containment Type and Capacity: Secondary containment for the drums is provided by spill <br /> trays and the physical structure of the compressor room. <br /> The facility is operated 24 hours per day and a leak or rupture would be immediately apparent to personnel. <br /> Secondary Containment Drainage: Secondary containment provided by the compressor room is protected <br /> from rainfall. <br /> Spill Prevention Devices: The drums are not filled on site;thus,spill prevention devices are not applicable. <br /> There are shut-off valves accessible to facility personnel for all of the non-fuel overhead transfer lines. <br /> Spill Flow Pattern: Spills would be contained and cleaned inside the building structure. <br /> Tire Storage <br /> Secondary Containment Type and Capacity: Secondary containment for the drums is provided by spill <br /> trays and the physical structure of the tire storage room. <br /> The facility is operated 24 hours per day and a leak or rupture would be immediately apparent to personnel. <br /> Secondary Containment Drainage: Secondary containment provided by the tire storage room is protected <br /> from rainfall. <br /> Spill Prevention Devices: The drums are not filled on site;thus,spill prevention devices are not applicable. <br /> Spill Flow Pattern: Spills would be contained and cleaned inside the building structure. <br /> Truck Wash <br /> Secondary Containment Type and Capacity: Secondary containment for the drums is provided by spill <br /> trays, the physical structure of the truck wash equipment bay and the trench drains that discharge into <br /> oil/water separator for the maintenance shop. <br /> The facility is operated 24 hours per day and a leak or rupture would be immediately apparent to personnel. <br /> Secondary Containment Drainage: Secondary containment provided by the truck wash equipment bay is <br /> protected from rainfall. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.