My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2800 - Aboveground Petroleum Storage Program
>
PR0527397
>
COMPLIANCE INFO_
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2019 4:31:56 PM
Creation date
5/28/2019 1:02:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527397
PE
2832
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J O A Q U I N Environmental Health Department <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> MARTIN-BROWER CO 4704 FITE CT, STOCKTON Apri130,2019 <br /> Qualified Facility-Tier I <br /> 405 CFR 112.6(o)(3)(111) Overfill prevenucn for containers not provided,not described in Plan,or tested uV iiR rCOS <br /> Qualified Facility-Tier 11 <br /> 501 CFR 112,6(x)(1), Tier 11 Qualified Facility Plan notcedified by the ow,eror a PE,as required o V o R c COS <br /> 112.6(6) <br /> 502 CFR 1126(b)(2) Tier l l Qualified Facility Plan technical amendment not certified by the owner or a PE iiV iiR i COS <br /> 503 CFR 112.6(b)(3) Failure to have a PE carry In writing alternative measures for a Tier 11 Qualified Facility oR coos <br /> 112.6(6)(4 <br /> Sc4 CFR 112.5(b)(4)n Failure of owner to assure that a P E makes all required straddlers in a Tier l l Plan .V .R .COS <br /> General Requirements for SPCC Plans <br /> 601 CFR 112.7 Failure of Plan to fulfill basic requirements Including ac -referencing section .V .R .COS <br /> 602 CPR 112.7(a)(2) Plan failed to discuss equivalent environmental protection,if applicable nV nR .COS <br /> 603 CFR 1127(.)(3) Failed to adequately describe the physical layout of the facility In the Plan oV iiA "COS <br /> 604 CFP 112.7h )(i) Plan failed to Include of type and storage capacity for each container uV riR i,COQ <br /> 605 CFR 1127(a)(3)(I) Plan failed to adequately discuss discharge prevention measures,Including routine handling r,V riR iCOS <br /> 606 CFR 112.7(a)(3)(iii) Plan failed to adequately discuss facility drainage or drainage controls ov oR .cos <br /> 607 CFR 112.7(a)(3)(Iv) Plan failed to Include countermeasures for discharge discovery,response and cleanup it ,R .COS <br /> 606 CFR112.7(n)(3)(v) Plan failed to address disposal methods for recovered materials it it iiCOS <br /> 509 CFR 112.I(agen, Plan failed to Adequately contain procedures for reaching a discharge iiV iiR -.COS <br /> 112,](a4) <br /> 610 CFR 112](x)(5) Diremerge procedures are not adequately addressed if the facility has no response plan .V .R FCOS <br /> Bit CFR 112](6) Plan failed to Include a description of potential equipment failure or provide equivalence iiV iiR uCOS <br /> .12 CFR 1127(6) Plan telletl to include secondary containment,diversionary structures,or equip to prevent discharge o V o R : COS <br /> 613 CFR 1127(c) Failure to provide appropriate secondary containment,diversionary structures or equipment oV oR ,COS <br /> 614 CFR 112 Par) PE equated Plan failed to explain Impracticability of containmanVd'rversionary structures .V .R c COS <br /> 615 CFR 1127(d) Failure to perform Integrity and leak facing when claiming secondary containment impracticability, .V .R ,COS <br /> 510CFR 112](4)(1) Failure to prepare an oil spill contingency plan when claiming impracticability cfstructures uV ,R .COS <br /> 6O GFR 112](4p2) <br /> No written commitment of manpower equipment,and materials to ccntrcl and remove oil discharge o V o R c COS <br /> 616 CFR112](e),n26(c) Failed to keep records of procedures inspections,or integrity tests for three years at •R . COS <br /> (6 <br /> 619 1 CFR 1123(f)(1) Felled to train personnel on all discharge prevention details listed in this section o V o R c COS <br /> 62o CFR 1123(f)(2) Failed to designate a person accountable for discharge prevention o V ,R ri COS <br /> 621 CFR 1123(f)(1) Failure to include in the SPCC Plan an adequate description of employee training .V .R irCOS <br /> 622 CFR 112.7h)(3) Failure to conduct complete annual discharge prevention briefings for oil handling personnel .V .R u COS <br /> 623 CFR 112,7(g) Plan failed to address security of site and valves,lock court,out,and lighting o V o R o COS <br /> 624 CFR 112](g) Facility failed to Implement security of site and valves,lock ovvtag out,and lighting n V o R o COS <br /> 625 OFR 112,](h) Plan falletl to adequately discuss facility tank car and tank truck lcadinglunloadlug rack it it irCOS <br /> 626 CFR 112.7(h)(1) Lcadmganlcedmg rack comrnmem system not adequate to contain spill .V .R ,COS <br /> FAcc14693 lapo W SC6% 64/3012019 <br /> EHC 20-01 Rev.0912112019 Page 2 of Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stocktc IT California 95205 1 T 209 466-3420 1 F 209 464-0138 1 wwwsjcehd.con <br />
The URL can be used to link to this page
Your browser does not support the video tag.