Laserfiche WebLink
The Merlin-Brower Company,L.L.C.4704 Fite Ct. Stockton, CA 95215 1 O:209.946.37121 M:209.810.67211 E:chays(iamanin- <br /> brower.com <br /> From:Tony McElligott [mailto:tonvmcelliaott.o.ePgmail.com] <br /> Sent:Tuesday,July 30,2019 9:51 AM <br /> To: Hays Casey<CHays@martin-brower.com>;Tony McElligott<tonymcelllaott.D.e@amall.com> <br /> Cc: cliff@westecheauioment.com <br /> Subject: Re: FW:{EXTERNAL}TANK QUOTE-seismic and other items <br /> Hi Casey,Cliff- <br /> I spoke with Cliff this morning,and he said that Westech is the distributor, Liquid Containment is the tank fabricator. <br /> We discussed what Westech's role is in this project(just the tank),and the design details that we'd like incorporated into <br /> the tank,specifically the seismic anchors. <br /> Cliff has sent me an additional drawing where clips are referenced (and the quote showing that the clips are included). <br /> The anchor clips are listed as item 10,but not shown on the drawing. The drawing for the clips is listed as"DWG. <br /> ACB005." <br /> Cliff-I checked LC's web site but could not find this detail-can you get that drawing for mel <br /> What we will need now is the detail,and ideally,shop drawings showing where and how the clips will be attached to the <br /> tank,along with the design loads for the clips/welds. <br /> Casey,as you said to me,we need the anchors on the short sides of the tank so we can get to them to install the <br /> bolts. We need to review Liquid Containment's design to see if the clips are on two sides or four. <br /> For the project as a whole,we will need the following: <br /> Existing tanks closure/removal <br /> 1. Closure Application/Closure Plan/FD approval <br /> 2. Decommission existing tanks(disconnect piping,drain to drip-dry state) <br /> 3. Sell/dispose/store decommissioned tanks. <br /> 4. File Closure Report <br /> New tank installation <br /> 1. The tank design drawings/cut sheets. <br /> 2. Drawing(s)for the shop area showing the installation location and piping runs/piping design. <br /> 3. Seismic/flood design of the anchor system (load calculations,bolt specification). <br /> 4. Approved building and fire permits from City of Stockton(mechanical,electrical,structural,fire). <br /> 5. Contractor or in-house team for tank and anchor installation. <br /> 6. Special Inspection oversight of anchor bolt installation. <br /> 7. Building department inspections(mechanical,electrical,structural,fire),and sign-offs. <br /> Then,brief update of SPCCP to reflect as-built conditions. <br /> Project complete! <br /> Best regards, <br /> Tony <br /> 3 <br />