My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS 1986 -1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
3535
>
3500 - Local Oversight Program
>
PR0544497
>
FIELD DOCUMENTS 1986 -1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:10:32 PM
Creation date
5/28/2019 2:01:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1986 -1993
RECORD_ID
PR0544497
PE
3528
FACILITY_ID
FA0003687
FACILITY_NAME
OLD TRUCK STOP, THE
STREET_NUMBER
3535
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13206009
CURRENT_STATUS
02
SITE_LOCATION
3535 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORKPLAN <br /> The soil will be remediated using enhanced ex-situ bioremediation methods. Enhanced <br /> bioremediation utilizes naturally occurring soil microbes to degrade petroleum hydrocarbons <br /> in the soil. The soil will be spread in an approximate one foot lift on 10 mil plastic in the <br /> fenced yard shown on Figure A. The soil was moved to this location to facilitate site <br /> drainage within the Thomas Yard and to allow it to be remediated in a secure area. An <br /> earthen berm will be created around the soil to be remediated to prevent runoff during the <br /> rainy season. Water will be added to the soil by a sprinkler system to maintain a moisture <br /> content of approximately 20 to 30 percent. Periodically nitrogen will also be added to the <br /> soil to enhance microbial growth. The nitrogen will be added at rates not exceed <br /> agricultural usage. <br /> After the initial application of nitrogen, the spread soil will be worked twice a month with <br /> a disc. The discing period will begin in April 1993. The soil will be maintained by periodic <br /> watering and discing. The owner will visit the site at least weekly to ensure that the soil <br /> does not dry out and cause a dust condition when subjected to wind action. After a period <br /> of four to six weeks, the spread soil will be sampled to determine remediation effectiveness. <br /> The goal of remediation is a TPH concentration of 10 parts per million or less. Upon <br /> reaching the remedial goal, a request will be made for site closure from San Joaquin <br /> County. The remediated soil will then be used for fill at the site. <br /> POSSIBLE HAZARDS <br /> There are no possible hazards to the public if the soil is remediated in accordance with the <br /> proposed plan. The soil does not contain volatile compounds that could effect the <br /> surrounding air. The soil will remain in a fenced, locked area. Runoff and blowing dust <br /> will be prevented by berming the soil and maintaining a moist condition by an automatic <br /> sprinkler system. <br /> Ground water at the site is greater than 70 feet below ground surface and is overlain by <br /> tight clay soils. The remediated soil will not impact ground water or surface waters, <br /> adjacent surface soils. <br /> f:\projects\exsum.193 <br />
The URL can be used to link to this page
Your browser does not support the video tag.