Laserfiche WebLink
Mr. Michael Infurna <br /> . December 17, 1993 <br /> Page 4 <br /> Proposed Schedule <br /> Interim remedial activities will begin January 1,.1994. <br /> The water supply wells will be investigated during the first quarter of 1994. The schedule <br /> of this work will be relayed in writing to the County as soon as bids are obtained from local <br /> contractors and the work can be scheduled. The bidding process has been started by Mr. <br /> Robert Cecchini. <br /> Summary <br /> Although the optimal activities at the site would be to install three or more additional <br /> ground water monitoring wells, these additional wells cannot be installed at this time <br /> because of the financial circumstances of the client. The client has submitted an application' <br /> form for funding from the Regional Water Quality Control Board and is awaiting their <br /> response. The proposed interim remediation and investigation of the possible use of the <br /> water supply wells for monitoring are measures consistent with Title 23 corrective action <br /> requirements. <br /> The work performed by the client currently and in the past year has been in good faith and <br /> with efforts to perform source control. The client will remove the underground tanks by <br /> 1998 and is currently attempting to obtain the financial resources to do so. <br /> Please contact Sue Wickham of ESE at (510) 685-4053 or Mr. Ellis Cecchini at (510) 757- <br /> 7700 with any questions or comments regarding this letter. <br /> Sincerely, <br /> ENVIRONMENTAL SCIENCE & ENGINEERING, INC. <br /> `f -W4�-� <br /> Susan S. Wickham, RG 3851 <br /> Senior Geologist <br /> PC: Ellis Cecchini <br /> Robert Cecchini <br /> RWQCB - CV <br /> f:\6925400\resoe12.93 <br />