My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1988 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
3535
>
3500 - Local Oversight Program
>
PR0544497
>
SITE INFORMATION AND CORRESPONDENCE 1988 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:54:53 PM
Creation date
5/28/2019 2:12:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1988 - 2001
RECORD_ID
PR0544497
PE
3528
FACILITY_ID
FA0003687
FACILITY_NAME
OLD TRUCK STOP, THE
STREET_NUMBER
3535
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13206009
CURRENT_STATUS
02
SITE_LOCATION
3535 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental <br /> Science & <br /> K", <br /> -- Engineering,Inc. , ; <br /> �. <br /> A CILCORP Company <br /> APR 19 1993 <br /> ENVIRONMENTAL HEALTH <br /> April 14, 1993 <br /> Project 6-92-5400 <br /> Ms. Diane Hinson <br /> San Joaquin County Department of Environmental Health <br /> 445 N. San Joaquin Ave. <br /> Stockton, CA /80v 35.26 <br /> SUBJECT: Fueling Island - 3535 E. Cherokee Road, Stockton, CA <br /> Dear Ms. Hinson: <br /> Environmental Science & Engineering, Inc. (ESE), on behalf of Cecchini, Cecchini, and <br /> Giovannoni is notifying you of work to be conducted at the subject site. There is currently <br /> one monitoring well, UST-1, located within the fueling island at the site. Well UST-1 has <br /> had problems with leakage of fuel from the surface and has been repaired twice within the <br /> last year. The latest repair was March 1992 when ESE placed a second cover and re-fitted <br /> the water tight seal on the well. The well has been in a quarterly monitoring program since <br /> October of 1992. The first quarter 1992 monitoring was delayed due to repairs needed on <br /> the well. <br /> The purpose of the work is to clean the well of debris and fuel, measure well efficiency and <br /> pumping rates, perform quarterly monitoring and extract water from the well on a weekly <br /> basis. By extracting water on a weekly basis, we expect to remove petroleum hydrocarbons <br /> in ground water in the immediate vicinity of the well. The work will be performed by ESE <br /> and Mr. Robert Cecchini. <br /> The work has been scheduled for April 23, 1993 beginning at 10 AM. The first phase of <br /> work, well cleaning, pumping, and quarterly monitoring, will be performed by ESE. This <br /> work is as follows: <br /> • Measure water level and product levels in the well with an electronic interface probe. <br /> Obtain data. <br /> Clean Well UST-1 by pressure washing or steam cleaning the well with clean water. <br /> Concurrently with cleaning, the well will be pumped of debris and all fluids. The <br /> amount of fluid extracted from the well will be five volumes more than that used to <br /> clean the well. An air-lift pump will be used to evacuate the well during the cleaning <br /> process. All fluid and debris evacuated from the well will be stored in Department <br /> of Transporation rated labeled drums in a secure area of the site. <br /> 014 , <br /> 4090 Nelson Avenue,Suite J Concord,CA 94520 Phone(510)685-4053 Fax(510)685-5323 \ <br />
The URL can be used to link to this page
Your browser does not support the video tag.