My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1988 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
3535
>
3500 - Local Oversight Program
>
PR0544497
>
SITE INFORMATION AND CORRESPONDENCE 1988 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 2:54:53 PM
Creation date
5/28/2019 2:12:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1988 - 2001
RECORD_ID
PR0544497
PE
3528
FACILITY_ID
FA0003687
FACILITY_NAME
OLD TRUCK STOP, THE
STREET_NUMBER
3535
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13206009
CURRENT_STATUS
02
SITE_LOCATION
3535 CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced , ,tit f kFff 11 <br /> GeoEnvironmental" i <br /> of Northern California <br /> 04 April 1997 - <br /> AGE-NC Project No. 97-031.2 <br /> Mr. Michael.Infuma <br /> SAN JOAQUIN COUNTY PHS-EHD <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> Subject: Tentative Schedule of Work <br /> CHEROKEE TRUCK STOP (Former Delta Truck Sales) <br /> 3535 East Cherokee Road, Stockton, California <br /> Dear Mr. Infurna: <br /> In accordance with the request of Mr. Ellis Cecchini of Ceechini, Cecchini and Giovannoni, <br /> Advanced GeoEnvironmental, Inc.-(AGE)has prepared the following tentative schedule of work for <br /> the completion of assessment activities,removal of underground storage tanks (USTs), installation <br /> of new USTs or above-ground storage tanks(ASTs)and remediation of hydrocarbon-impacted soil <br /> and ground water at 3535 East Cherokee Road, Stockton. California: <br /> The tentative schedule of work is as follows: <br /> March 1997 to.? Continue ground water monitoring on a quarterly basis at the site. <br /> April 1997 - Submittal of UST removal work plan-to the PIIS-F:H.D.. Removal plan xilI <br /> include procedures for excavation of hydrocarbo:i-impacted soil, if <br /> encountered. <br /> May 1997 Reviewand approval of UST removal work plan by the PHS-EHD. <br /> June - July 1997 . . Removal of existing USTs, dispenser islands and piping. Excavation of . <br /> hydrocarbon-impacted soil from the UST and dispenser areas.-Ekcavated soil <br /> will be stock''led on-site for characterization..Installation of new USTs or <br /> ASTs, if necessary. .. <br /> August 1997 Disposal of stockpiled hydrocarbon-impacted soil. Installation of additional - <br /> soil vapor,extraction wells, in-situ air sparging wells and performance of <br /> feasibility studies to determine appropriate remedial alternatives for the site. <br /> 1803 West March Lane,Suite A,Stockton,California 95207 <br /> Telephone(209)956-0264 FAX.(209)956-0700 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.