Laserfiche WebLink
Lo' `-we <br /> 30 March 2012 <br /> AGE-NC Project No. 97-0312 <br /> Page 6 of 8 <br /> Soil cuttings and rinseate generated during drilling activities will be containerized in <br /> properly labeled Department of Transportation(DOT)-approved 55-gallon drums, and <br /> stored on-site in an area lacking public access. Disposal alternatives for rinseate and soil <br /> will be selected based on results of a laboratory analysis. <br /> 3.2. WELL COMPLETION AND SURVEY <br /> The high vacuum SVE wells, VW-4 through VW-8, will be completed utilizing 4-inch <br /> diameter schedule 80 polyvinylchloride (PVC) well casing with 15 feet of 0.030-inch <br /> continuous slot PVC well screen. <br /> Vapor wells VW-9, 10 and 11 will be completed utilizing 4-inch diameter schedule 80 PVC <br /> well casing with 20 feet of 0.030-inch continuous slot PVC well screen. <br /> After installing the well casing in the boring, a filter pack material will be slowly poured <br /> through the augers over the screen interval to approximately two feet above the screened <br /> intervals; filter pack material in the SVE wells will consist of a #3 Lonestar or coarse sand. <br /> A one foot bentonite seal (bentonite chips)will be placed above the filter pack to minimize <br /> the potential for grout penetration into the screened section of the well. The bentonite seal <br /> will be formed by pouring bentonite chips into the annulus and allowing the chips to settle <br /> on the filter pack. The bentonite chips will be allowed to hydrate with tap water for a <br /> minimum of one-half hour prior to grouting. <br /> The remaining annular space will be filled to within 1 foot bsg with a cement grout. The <br /> grout mixture will consist of Type 1/II portland neat cement and not more than 6 gallons of <br /> water per 94-pound sack of cement. The grout will be placed by pumping through tremmie <br /> pipe. A grouting inspection will be scheduled with EHD personnel. Proposed well <br /> construction diagrams are depicted in Figures 5 and 6. <br /> Following completion of the SVE wells,well elevation and global positioning system (GPS) <br /> location will be surveyed by a California-licensed surveyor relative to a benchmark. Well <br /> elevation will be surveyed in a format acceptable for the State GeoTracker database. <br /> 3.3. SVE SYSTEM DESIGN AND IMPLEMENTATION <br /> A portable high vacuum, oil-ring blower equipped, SVE system with 240Volt, 3-phase, <br /> electrical heated catalytic oxidizer (specifications to follow in report) will be placed at the <br /> site for HVSVE operation. The blower system will be attached to all vapor wells; vacuum <br /> readings will be obtained from surrounding wells (Figure 2). <br /> Advanced CeoEnvironmental,Inc. <br />