Laserfiche WebLink
r Page I of 4 <br /> Mike Infurna [EH] <br /> From: Mike Infurna [EH] <br /> Sent: Thursday, July 31, 2008 11:47 AM <br /> To: 'Icardinalli@advoeoenv.com' <br /> Subject: RE: Cherokee Update <br /> thank you. <br /> I'll keep the permit open for SB-30 on August 27. <br /> call me Aug 26 to update/confirm please. <br /> From: Lauren Cardinalli [Mai Ito:Ica rdinalli@.advgeoenv.com] <br /> Sent: Thursday, July 31, 200811:28 AM <br /> To: Mike Infurna [EH] <br /> Cc: Robert Marty <br /> Subject: RE: Cherokee Update <br /> To Mike Infurna <br /> SJC — EHD Senior REHS <br /> Well Details <br /> In the field I made an alteration to the sampling. VW-2 is located in front of the building to <br /> correlate with how the sampling was Iabeled.VW-3 is now by the fence. <br /> Both of these walls are 2 inch, sch 80, 0.030slot PVC <br /> 20 foot of screen, 10 feet of blank <br /> VW-2 8 bags of sand <br /> 1 bag of bentonite chips hydrated twice <br /> VW-3 7 bags of sand <br /> 1 bag of bentonite chips hydrated twice <br /> A total of 6 bags of Portland Type II were hydrated and added at a different points in the day to <br /> make the grout seal for both wells. <br /> The cement mix was ready mix and quick set (5 to 3)to finish up with the well installs. All Three <br /> well boxes were set at 4 pm. . <br /> I am going to be using this permit to complete the OZ bench scale sample boring on August <br /> 27th. So that means no final on the permit <br /> Sincerely, <br /> Lauren D. Cardinalli <br /> Advanced GeoEnvironmental, Inc. <br /> Stockton • Santa Rosa • Monterey •Brea <br /> 1-800-511-9300 <br /> 7/31/2008 <br />