My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
1126
>
2800 - Aboveground Petroleum Storage Program
>
PR0527768
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 2:32:27 PM
Creation date
5/28/2019 4:37:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527768
PE
2832
FACILITY_ID
FA0003771
FACILITY_NAME
E F KLUDT & SONS INC
STREET_NUMBER
1126
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906022
CURRENT_STATUS
01
SITE_LOCATION
1126 E PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPCC Plan — E. F. Kludt & Sons, Inc. Lodi, CA <br /> Leakage from Internal Heating Coils <br /> 40 CFR 112.8(c)(7) <br /> There are no internal heating coils within this system. The applicable <br /> requirements of 40 CFR 112.8(c)(7) do not apply to this facility or SPCC Plan. <br /> Engineer or Update Containers to Avoid Discharge 40 CFR 112.8(c)(8) <br /> E.F. Kludt & Sons, Inc. uses an automatic tank gauge system consisting of a <br /> California certified Veeder Root tank probe and an audible alarm on their USTs. The <br /> alarm will sound upon the tank volume reaching 90% of the tank's capacity. The UST <br /> system is also equipped with overflow prevention drop tubes. No UST can fill beyond 90 <br /> percent of its volume when the overflow prevention device is engaged. When the driver <br /> arrives on site and prior to unloading any oil product, they will verify tank space and <br /> insure that the oil product to be delivered will fit. If the audible alarm sounds during <br /> delivery the driver will cease all loading and secure the system. All the ASTs are <br /> protected from overfill by a Scully system. No tank or container, connected through the <br /> Scully system, will fill beyond 90 percent of capacity. <br /> Observe Effluent Discharge 40 CFR 112.8(c)(9) <br /> -- E.F. Kludt & Sons, Inc. does not employee a surface water effluent or water <br /> separation treatment system at this site. The requirements in 40 CRR 112.8(c)(9) are <br /> not applicable. <br /> Promptly Address Visible Discharge 40 CFR 112.8(c)(10) <br /> This is addressed within this Plan at 40 CFR 112.7(e). <br /> Mobile or Portable Storage Containers 40 CFR 112.8(c)(11) <br /> There are several mobile and/or portable containers within this system. The totes <br /> and 55-gallon oil drums are portable and the applicable requirements of 40 CFR <br /> 112.8(c)(11) does apply to this facility or SPCC Plan (40 CFR 112.7(e)(2)(xi)). <br /> Facility Transfer Operations 40 CFR 112.8(d)(1) (2) (3) (4) & (5) <br /> These items are addressed in 40 CFR 112.7(a)(3)(iii) <br /> George W.Lawry 011,Inn <br /> Enwonmen1e15ervires eivision 33 <br /> 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.