Laserfiche WebLink
Ruvalcaba, Cesar <br /> From: Aron Kludt <aron@kludtoil.com> <br /> Sent: Tuesday,July 30,2019 8:43 AM <br /> To: Ruvalcaba,Cesar <br /> Subject: RE: return to compliance-PR0527768 <br /> Ok let me start working on this. <br /> Thank you, <br /> Arovu K.ludt <br /> Kludt Oil&Kludt Propane <br /> Address: 1126 E. Pine Street <br /> Lodi,CA 95240 <br /> (011 Phone: (209)368-0634 <br /> Cell: (209)712-2680 <br /> ssncr: rsez Fax: (209)368-9016 <br /> Email: aronCdkludtoil.com <br /> Website www.kludtoil.com <br /> From: Ruvalcaba,Cesar<cruvalcaba@sjgov.org> <br /> Sent: Wednesday,July 24,2019 2:50 PM <br /> To:Aron Kludt<aron@kludtoil.com> <br /> Cc: Stephen Kludt<stephen@kludtoil.com> <br /> Subject: RE:return to compliance-PR0527768 <br /> Hi Aron, <br /> The return to compliance for APSA/SPCC has been reviewed. One violation has been closed based on the provided <br /> statements.A list of updated open violations is provided.The"tank testing info"file was corrupted and couldn't be <br /> opened. Most of the violations may require an amendment to the SPCC plan. Most of the amendments may fall under <br /> the technical amendment category and will require certification by a registered Professional Engineer(PE). <br /> Violation#603-Failed to adequately describe the physical layout of the facility in the Plan. <br /> - Referring to the attachments of page 9,warehouse and tank&piping which address the UST tanks and piping in <br /> question along with layout of the facility. I did want to ask if we have to write"exempt' on the location of the UST tanks <br /> since they are clearly marked"USP' and anyone doing an inspection would know they don't fall under AST? <br /> Unfortunately the regulations are very specific in this matter,resubmit a facility diagram that marks USTs as "exempt". <br /> One of the maps also seems to be missing the kerosene and racing fuel UST. The location of the sued oil tank may be <br /> incorrect in one of the diagrams. Below is what the regulations states: <br /> Describe in your Plan the physical layout of the facility and include a facility diagram, which must mark the location <br /> and contents of each fixed oil storage container and the storage area where mobile or portable containers are <br /> located. The facility diagram must identify the location of and mark as "exempt"underground tanks that are <br /> otherwise exempted from the requirements of this part under§112.1(d)(4). The facility diagram must also include all <br /> transfer stations and connecting pipes, including intra-facility gathering lines that are otherwise exempted from the <br /> requirements of this part <br /> Violation#626- Loading/unloading rack containment system not adequate to contain spill. <br /> I <br />