Laserfiche WebLink
05/29'96 15:57 PAX 916 387 0802 DAMES & HOORE Z004 <br /> 6 The[e line will be removed,and shot perforating strings provided by Halliburton will be lowered on <br /> a wire line into the gra, and 2. OMC in Pilo' <br /> lace shot Perforatious will be made from 370 to 362 feet <br /> bgs, 340 to 310 feet bgs, and 240 to 212 feet bgs. <br /> 7. A packer win be lowered on a tremie line to a depth of approximately 150 feet so that it is above the <br /> Original <br /> Nell Perforations from 168 to 158 feet bgs. The packer will be pressured with nitrogen to <br /> form a seal-11 <br /> eal against the inside of the casing, and held in place by Chaining the upper end of the tremie <br /> line to the well casing- Using grout slurry introduced through the tremie line, a pressure of <br /> approximately 50 psi Will <br /> be maintained for one hour. The packer will then be removed, and the <br /> grout allowed to set overnight- <br /> Day 3 P I m'1 `t� G t"o t.AJ- Se�j e-j t-+ 10 ( <br /> 8• Tho third,or upper lift from 150 to 5 feet bgs will be grouted using the same grout specification and <br /> in a similar manner as the middle M. <br /> 9. The depth interval of 118 to if 12 feet bgs will be shot perforated us <br /> described above, ing the same methodology as <br /> 10- A Packer will be Placed at 5 feet bgs and a pressure of approximately <br /> The packer will then be removed, 100 Psi maintained for one hour. <br /> and the grout allowed to set overnight. <br /> Day 4 PA-c-02-e2 ( b/_l a- I be Q e J aun o t{t <br /> 11. The well location will be surveyed to the base coordinate system. <br /> 12- - <br /> fh <br /> e <br /> fill around the casing will be excavated to a depth of 5 feet bgs. Using a torch, the casing will <br /> be cut and removed at 5 feet bgs. <br /> 13. The remaining open casing will be slightly overfilled with grout by$eylik, forming a cap <br /> 14. The fill around the outlet pipe will be excavated to a depth of approximately 5 feet bgs, the pipe em <br /> with a torch, and a metal plate weeded to the pipe- <br /> Day 5 <br /> I5. The two excavations, each of which are estimated to be 10 feet <br /> square <br /> backfilled by Diede Construction with the excavated fill topped with 10 inches of and five feet deep, <br /> cep, will be <br /> The backtril will be compacted in 6-inch lifts us" Material <br /> 4 inches below mg a vibra-plate. The filled grade shall be Sniched <br /> the existing asphalt grade level. <br />