My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:42:43 AM
Creation date
5/29/2019 11:07:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/23/95 14:35 '&801 272 0430 IIONTGONERY WATSN 1J003 <br /> location of sample interval in respect to 5nal depth to represent soil <br /> properties of the proposed gallery. Once total depth of the borehole is <br /> reached,bentonite will be tremied through the inside of the auger up to a <br /> depth of 26 feet. A 20-foot section of 2-inch slotted casing(0.02-inch <br /> slot)threaded to a 5-tiwt section of blank casing will be suspended <br /> through the center of the auger from the ground surface. Monterey 12 x <br /> 20 mesh filter pack will then be slowly treaded through the auger when <br /> the augers are removed to ensure proper placement of the filter pack up to <br /> a depth of 4 feet. A 2-foot bentonite seal will be placed on top of the filter <br /> pack. The bentonite seal will be partially hydrated by adding at least l0 <br /> gallons of clean potable water. A temporary flush-mounted traffic-rated <br /> well vault will be installed over the well_ The top of the infiltration test <br /> well will be secured with a watertight well cap. <br /> • Both constant-head and falling-head field infiltration tests will be <br /> performed in each infiltration test well to estimate a combination of vertical <br /> and horizontal_hydraulic conductivity of the strata intersected by the <br /> borehole. Potable water wilt be frequently added to the infiltration test <br /> well for at least 12 hours before the infiltration tests to create saturated <br /> conditions in the surrounding vadose zone prior to each falling-head test. <br /> • The falling-head test will be conducted by 5lfing the infiltration test well <br /> to an elevation near or at ground surface. The water level.within the test <br /> well then will be measured at regular intervals by atransducer and <br /> confirmed with manual measurements until the water level has dropped <br /> below the bottom of the casing. The process will be repeated as deemed <br /> practical in the field. The constant-head test will be performed <br /> subsequently after the falling-head test by pumping potable water into the <br /> infiltration rest well and adjusting the now until a constant water level is <br /> obtained. The equilibrium flow rate and manual water level measurements <br /> will be recorded on infiltration test data sheets and the field notebook: <br /> • The following tests will be performed on select soil samples collected <br /> from each boring: <br /> Visual classification(ASTM D2487)-for split-spoon samples <br /> collected in the eight 40-foot boreholes <br /> Grain-size sieve and pipette analyses (EPA Method 2-from USGS <br /> Procedures)-40 tests to characterize soil (to test one unsaturated, <br /> one capillary fringe,and one saturated sample from each borehole) <br /> In-situ moisture/density(ASTM D698)-40 tests to characterize soil <br /> (to test one unsaturated, one capillary fringe,and one saturated <br /> sample from each borehole) <br /> Specific gravity(ASTM D 854)-8 tests to characterize soil(to test <br /> coarse-grained material of Upper Horizon in eight boles to be <br /> selected in the field) <br />
The URL can be used to link to this page
Your browser does not support the video tag.