Laserfiche WebLink
NOTE: DDRW-WB will submit the draft final ROD 30 days after <br /> the end of the regulatory agencies review/comment period . <br /> COMPREHENSIVE SITE - WIDE DDRW TRACY RI/FS <br /> Draft RI/FS Work Plan 6 Jan 92 <br /> Draft Risk Assessment 8 Aug 93 <br /> (Secondary Document) <br /> Draft RI/FS Report 6 Dec 93 <br /> Draft Proposed Plan 6 Dec 93 <br /> Draft ROD 2 Oct 94 <br /> NOTE : DDRW-WB will submit the draft final ROD 30 days after <br /> the end of the regulatory agencies review/comment period . <br /> The Risk Assessment is a secondary document which will be <br /> submitted by DDRW-WB in advance of the RI Report . <br />