My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM -9- <br /> DEFENSE DEPOT TRACY <br /> SAN JOAQUIN COUNTY <br /> MONITORING WELLS: <br /> Monitoring wells LM-11 , LM-12 and LM-63 shall be monitored as follows: <br /> Type of Sampling <br /> Constituents Units Sample Frequency <br /> Specific Conductivity ranhos/cm Grab Quarterly <br /> pH pH Units Grab Quarterly <br /> Temperature ° F/°C Grab Quarterly <br /> Metals mg/l Grab Quarterly <br /> (Method 6010) <br /> Arsenic mg/l Grab Quarterly <br /> (Method 7060) <br /> Mercury mg/l Grab Quarterly <br /> (Method 7471) <br /> Selenium mg/l Grab Quarterly <br /> (Method 7740) <br /> Water Level ft. MSL Meter Quarterly <br /> Plan A At initiation and end of the injection of potable water to the <br /> injection wells. <br /> Plan B At initiation of startup and at 2-hour intervals dur, g startup and for <br /> the first 12 hours of the Prove-Out. Every six lours thereafter, <br /> throughout the duration of the Prove-Out. <br /> Plan C At initiation of startup and at 6, 12, 24, 48 and 96 hours of the <br /> Prove-Out <br /> Plan D At initiation of startup, after 4 hours of operation, and at the end of <br /> the Prove-Out. <br /> Plan E At initiation of startup and at the end of the Prove-Out. <br /> QUALITY CONTROL SAMPLES <br /> For quality control purposes the Discharger shall collect and have analyzed one <br /> sampling blank and one duplicate for every ten samples collected and analyzed. <br /> Each of these quality control samples shall be analyzed for the same parameters <br /> as the other samples collected. <br />
The URL can be used to link to this page
Your browser does not support the video tag.