Laserfiche WebLink
3 - • 24 November 2008 <br /> Mr. Maurice Benson <br /> Defense Logistics Agency <br /> 5. The results of pilot testing and a feasibility study of dieldrin remedial measures in the <br /> northwest corner of the Site have not been presented to the U.S. Environmental <br /> Protection Agency, California Department of Toxic Substances Control, and Regional <br /> Water Board. The feasibility of groundwater extraction and treatment is to be included in <br /> agencies have commented, it <br /> premature othe snshu down thethe lgroundwater extraction wellty has been reviewed and s and nd to conduct ebound testing s <br /> at the Site. <br /> til the items presented by Regional Water Board <br /> DESJC should withdraw the Work Plan un <br /> staff in this letter have been addressed. If you have any questions, please contact me at <br /> (916) 464-4675, or by email at jbrownell@waterboards.ca.gov. <br /> James R. Brownell, P.G. <br /> Associate Engineering Geologist <br /> cc: Mr. Michael Work, USEPA Region 9, San Francisco <br /> Mr. Peter MacNicholl, DTSC Region 1, Sacramento <br /> Mr. Harlin Knoll, San Joaquin County Health Department, Stockton <br /> Mr. Rich Howard, TechLaw, Inc., Sacramento <br /> Mr. Brian Renehan, AFCEE, San Antonio, Texas <br /> Mr. Michael Thomas, URS, Sacramento <br /> Mr. Rich Beyak, URS, Sacramento <br /> Mr. John Clark, URS, Sacramento <br /> Ms. Linda Bond, Noblis, Davis <br />