My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Maurice Benson - 2 - 8 April 2008 <br /> Defense Logistics Agency <br /> WORK PLAN COMMENTS <br /> 1. The Draft Work Plan summarized sampling of soil beneath the Building 10 <br /> concrete slab conducted by ACOE in December 2007. On 2 April 2008, <br /> Regional Water Board staff contacted URS staff to discuss the source of the <br /> ACOE investigation data. On 2 April, URS staff forwarded, via email, a draft of <br /> the ACOE report entitled Building 10 Industrial Waste Pipeline Inspection and <br /> Sampling Report of Findings, dated February 2008. However, the Draft Work <br /> Plan did not provide sufficient detail from that work, including sample locations <br /> and concentrations of contaminants of concern (CDCs). The Final Work Plan <br /> should include sufficient detail and should reference the ACOE results report. <br /> 2. The draft ACOE results report includes data on a 15 October 2007 video survey <br /> performed on waste pipes inside of Building 10. The notes and map generated <br /> during the field work (Appendix A) reference a concrete slab that filled a portion <br /> of a 4-inch diameter cast iron IW PL beneath the west part of the building, a <br /> 3-inch diameter cast iron waste pipe, a clean-out located about 40 feet south of <br /> the sump near the tool room, and filled pipe trenches west of the clean-out. <br /> DESJC should evaluate these recent observations made by ACOE and <br /> determine if the proposed sample locations in the Draft Work Plan should be <br /> adjusted. <br /> 3. The figures in the draft ACOE results report show features not shown on the <br /> figures in the Draft Work Plan. For example, ACOE Figures 1 and 2, and the <br /> video survey sketch map figure in Appendix A show sumps that are not shown <br /> on Figures 1 and 2 of the Draft Work Pian. These features and the features <br /> discussed in Item 2, above, should be considered for inclusion on the Draft Work <br /> Plan figures. <br /> 4. The Draft Work Plan proposes soil and groundwater sample analyses for total <br /> petroleum hydrocarbons (TPH) using USEPA Method 8015. Please identify the <br /> hydrocarbon range or ranges that the chemical analysis laboratory will quantify. <br /> 5. In Table 3-1 on page 3-2 of the Draft Work Plan, it states that 14 CPT borings will <br /> be advanced during Round 1 of the work and 31 CPT borings during Round 2. <br /> However, other tables and text in the Draft Work Plan indicate that 15 will be <br /> advanced in Round 1 and 30 in Round 2. <br /> 6. A typographical error in Section 1.1 .1 references Section 1 .2.2 rather than <br /> Section 1 .1.2. <br /> 7. A typographical error in Section 1.1.6 references Section 1 .2.4 rather than <br /> Section 1 .1.4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.