Laserfiche WebLink
f <br /> f f Defense Distribution Center <br /> Defense Distribution Depot San Joaquin California <br /> Tracy Site <br /> L <br /> April 2006 -m.. DDJC-Tracy Finalizes the Five-Year Review Process <br /> Defense Distribution Depot San Joaquin California, Tracy Site <br /> About DDJC (DDJC-Tracy) has conducted and completed a Five-Year Review of <br /> Defense Distribution Depot San the ongoing environmental restoration activities at DDJC-Tracy. <br /> Joaquin California, Tracy Site (DDJC- <br /> Tracy), is located approximately 1.5 <br /> miles southeast of Tracy,California. DDJC-Tracy Five Year Review <br /> The DDJC-Tracy Five-Year Review is a required activity by the Comprehensive Environmental Response, <br /> Operated by the Defense Logistics Conservation,and LiabilityAct(CERCLA). <br /> Agency (DLA) through the Defense What is a Five-Year Review? <br /> Distribution Center(DDC),DDJC-Tracy <br /> and its sister site DDJC-Sharpe serve The purpose of a five-year review is to evaluate the implementation and <br /> as a strategic distribution platform. performance of a remedy to determine whether the remedy is or will be protective <br /> DDJC stocks almost 800,000 different of human health and the environment. The evaluation of the remedy and <br /> items used by our military troops determination of protectiveness shouldbe based on,and sufficiently supported by, <br /> throughout the western U.S. and the data and observations. <br /> Pacific. <br /> Source:(omprehensive Five-Year Review Guidance, U.S. EPA <br /> Sincethe early 1980s,DDJC-Tracy has <br /> implemented an Installation The DDJC-Tracy Five-Year Review was performed in accordance with the requirements described in the <br /> Restoration Program (IRP) to identify Comprehensive Five-Year Review Guidance published by the U.S. EPA. The review included the <br /> and clean up environmental following activities: <br /> contamination resulting from past • Visits to all environmental sites and treatmentfacilities <br /> activities atthe site. • Review ofmonitoringdata <br /> • Review of all remedial action reports preparedforthe individual sites <br /> • Development of a Response Completion Plan(RCP) <br /> In coordination with the U.S. • An update of the Conceptual Site Model(CSM) <br /> Environmental Protection Agency • Interviews of interested stakeholders and community members <br /> (U.S, EPA), California Department of <br /> Toxic Substances Control(DTSC),and The DDJC-Tracy Five-Year Review was conducted from March to June of 2005;the final document was <br /> Central Valley Regional Water Quality completed in September 2005. <br /> X Control Board (CVRWQCB), DDJC This fact sheet summarizes the development and completion of the DDJC-Tracy Five-Year Review, <br /> manages the environmental highlights the comments made by interested stakeholders and community members, and outlines <br /> restoration activities at the reviewfindings. <br /> s installation. <br /> For More Information, <br /> please contact. <br /> Doug Imberi, <br /> DDJC Office of Command Affairs F <br /> (209) 839-4009■ � <br /> Current DDJC Warehouse <br /> ItI <br />