My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- 1 <br /> URS RECENEE) <br /> 14 July 2004 JUL 15 2004 <br /> ENVIRONMENT HEALTH <br /> Mr. Harlin Knoll PERMIT/SERVICES <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 E. Weber Avenue, Third Floor <br /> Stockton, CA 95202-0388 <br /> SUBJECT: Groundwater Piezometer Abandonment and Installation, DDJC-Tracy and <br /> Monitoring Well Installation, DDJC-Sharpe <br /> Dear Mr. Knoll: <br /> URS Corporation is being contracted by the U.S. Army Corps of Engineers to abandon 10 <br /> temporary groundwater piezometers and install 6 replacement permanent groundwater <br /> piezometers off-depot in the DDJC-Tracy Annex and install 4 monitoring wells on the San <br /> Lorenzo Lumber Company Property in Lathrop, west of DDJC-Sharpe. The field effort at <br /> DDJC-Tracy is schedule to begin on 19 July 2004 and will continue for approximately 2 to 3 <br /> days. The field effort for the monitoring well installation west of DDJC-Sharpe will be <br /> scheduled pending receipt of easement agreement with the property owner. <br /> Enclosed are 3 checks and 3 permit applications for the abandonment of the temporary <br /> piezometers on the DDJC-Tracy Annex, installation of the permanent piezometers on the <br /> DDJC-Tracy Annex, and installation of the four monitoring wells on the San Lorenzo Lumber <br /> Company Property for DDJC-Sharpe. The work plans for these field efforts are also enclosed. <br /> Please contact me at (916) 679-2367 with any questions or concerns. <br /> Sincerely, <br /> Sarah Tourre <br /> Project Manager <br /> URS Corporation <br /> Crown Corporate Center <br /> 2870 Gateway Oaks Drive,Suite 300 <br /> Sacramento,CA 95833 <br /> Tel:916.679.2000 <br /> Fax:916.679.2900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.