Laserfiche WebLink
Page 1 gw capture est <br /> Estimated Groundwater Capture Zone by Well <br /> Capture Dist <br /> Model Dist Zone Stagntn Mass <br /> Estimated Spec Cap Spec Cap Capture Stagntn Width Point, Removal <br /> Ave Flow gpm Perm Gradient Thick It Basis for Baseline Estimated T Estimated Zone Width Point, Spec Cap Spec Cap Cone Primary Rate <br /> Extraction Well (0) (fUday) (i) (B) Thick Spec Cap (gpd/ft) K(fUday) (Model Perm) Model K T K (ug/L) Constituents kg/day %Total <br /> EW-1 WB) 44 25 0.000884 50 <'XS 130 ''257500 24,0 7666 1220 7985 1271 7 tee 0.001685 13% <br /> EW-3(AIB) 44 25 0.000884 50 XS 13.0 - 25750.0 24.0 7666 1220 7985 1271 6 tee 0.001926 14% <br /> EW4 B 50 25 0.000884 50 XS 13.0 > 25750.0 24.0 8711 1386 9074 1444 3 lee 0.000821 6% <br /> EW-5(A/B) 76 25.0.000884 50 XS 13.0 >.' 257500 :>24.0 13589 2163 14155 2253 4 tee 0.001707 13% <br /> EW-6 B 75 25 0000884 - 50 XS 13.0 257500 .:`24.0 13067 2060 13611 2166 6 tee 0.002462 18% <br /> EW-7 PJB 60 25 0.000864 50 XS 13.0 25750.0 '.24.0 10453 1664 10889 1733 6 tee 0.001970 15% • <br /> EW-10 A/11 84 25 0.000864 -50 XS 13.0 :257500 24.0 14635 2329 15244 2426 6 tee 0.002758 21% <br /> EW-it C-zone <br /> Total 435 0.01333 <br /> W=Q/CxBxKxi Q=WxCxBxKxi W=Q/2pi'T'i <br /> 0.005194819 W=Width of capture zone upgradient <br /> 192.499472 Q=Extraction rale(gpm) Q=discharge(ft3/day) <br /> Q=gpm Q=cufUday C=Conversion 0.005195gal/ft3/min/day B'K=T=Transmislivity(ft2/day) 3442.5 5117.6471 <br /> 10. 1925.0 B=Saturated thickness(it) i=hydraulic gardient(ft/foot) <br /> K=Hydraulic Conductivity(ft/day) - <br /> i=hydraulic gradient(ft/foot) <br /> Capture zone assuming: <br /> T= 3442.51337 5117.647 3442.5134 5117.647 <br /> dawn cross <br /> down gradient crass gradient <br /> 0 i B K C W D(ft3/d, gradient W W gradient W W <br /> EW-1 WB) 44 0.001 50 70.0 0.005195. 2420 8470 392 263 2460 1655 <br /> EW-3(A/B) 44 0.001 50 . 70.0 0.005195 2420 8470 392 263 2460 1655 <br /> EW4(B) 50 0.001 50 r 70.0 0.005195 2750 9625 445 299 2796 1881 <br /> EW-5 WB) 78 0.001 50 70.0 b.005195 4290 15015 694 467 4362 2934 • <br /> EW-6(B) 75 0.001 5070.0 0.005195 4125 14437 667 449 4194 2821 <br /> EW-7(AIB) 60 0.001 50 : 70.0 0.005195' 3300 11550 534 359 3355 2257 <br /> EW-10(AIS) Jkl, 84-. 0.001 . 50 . 70.0 0.005195 4620 16170 748 503 4697 3160 <br /> EW-11 (C-zone) <br /> Total 435 001 50- 70.0'-0.005195 2392 83737 387 260 2432 1636 <br /> 7.48052 gal/tuft <br /> 1440 min/day <br /> 1440/7.48052=cuftmin/galday=l92.5cuftmin/galday <br />