Laserfiche WebLink
INITIAL RELEASE DDJC Tracy <br /> TABLE 1. Operable Units (continued) <br /> Operable <br /> Unit No, Site Description Waste Disposal History Contanunated Media Remedial Alternative <br /> Day Care Center Located on the west side of the depot near Soil: SVOCs and Native soil cover to reduce <br /> the main entrance,the Day Care Center pesticides exposure opportunities. Some <br /> yard once contained a 1,200-gallon UST. remedial actions may be <br /> warranted. <br /> OU 2C SWMU 2—Present Sewage Lagoon Consists of active unlined sewage lagoons Soil:Metals, Evaluated in DDJC Tracy's <br /> that receive treated effluent from the pesticides,and Engineering Evaluation and <br /> sewage treatment plant. SVOCs Cost Analysis. <br /> SWMU 3—Industrial Lagoon Consists of two lined industrial lagoons Soil:Metals,SVOCs, <br /> that received industrial wastewater from and pesticides • <br /> the recoup,degreasing,paint stripping, <br /> and steam cleaning operations. <br /> SWMU 33—Industrial Waste Pipeline An industrial pipeline used to convey Soil: SVOCs, <br /> waste streams to the industrial pondspesticides,and metals <br /> 28 <br />